Beyond Site Material Handling and Transportation in Large-Scale Construction Projects

被引:0
|
作者
Abeysinghe, A. M. G. P. [1 ]
Waidyasekara, K. G. A. S. [1 ]
Melagoda, D. G. [1 ]
机构
[1] Univ Moratuwa, Dept Bldg Econ, Moratuwa, Sri Lanka
关键词
Material Handling; Material Transportation; Large Scale Construction Projects; Issues; Causes; INDUSTRY; SYSTEMS; SAFETY;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There is a significant contribution of materials to be handled, transferred, and used; further, large logistics operations are related to transporting, storing, moving, and reloading in large scale construction projects. Thus, the research aims to investigate issues that occur beyond the site, material handling, and transportation in large-scale construction projects. Accordingly, extensive literature was synthesized to identify the usage of materials in large-scale construction projects, their significance, and procedures of material handling and transportation. This study adopted a qualitative research approach by selecting a multiple case study strategy. Five large-scale construction projects in Colombo Metropolitan area were selected and semi-structured interviews were conducted with three different levels of site personnel from each case study. Finally, the gathered information was analyzed using computer-based content analysis and further supported by data collected through observations. The outcomes disclosed various issues in material handling and transportation with respective causes and possible solutions to minimize identified issues in large scale construction projects. Accidents, adverse weather conditions, lack of material handling equipment, lack of labors, improper packing systems, misplace and steal of materials, lack of pre-arrangements, bulk quantities, limited site area, delay in taking approvals, improper supervision and unawareness of the handling process were identified as common material handling and transportation issues. It was identified these can be mitigated by proper supervision, providing a manual to handle each material, labeling material, maintaining good communication with laborers and arranging a gate pass system. Further, recommendations for improving material handling and transportation were provided for industry practitioners.
引用
收藏
页码:66 / 71
页数:6
相关论文
共 50 条
  • [1] Multi-objective bilevel construction material transportation scheduling in large-scale construction projects under a fuzzy random environment
    Xu, Jiuping
    Gang, Jun
    TRANSPORTATION PLANNING AND TECHNOLOGY, 2013, 36 (04) : 352 - 376
  • [2] The Integrated Management in the Large-Scale Projects' Construction
    Liu, Yisheng
    Bao, Lijia
    Chen, Xu
    LISS 2013, 2015, : 329 - 334
  • [3] Integration management of large-scale consrtuction construction projects
    Chen, YQ
    Jiang, L
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1449 - 1453
  • [4] A survey on communications in large-scale construction projects in China
    Tai, S.
    Wang, Y.
    Anumba, C.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (02) : 136 - +
  • [5] Bargaining Games for Material Procurement in Large-scale Projects
    Fan Dong
    Xiao Tiao-jun
    Yang Dan-qin
    2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 265 - 270
  • [6] The Use of Unmanned Aerial Vehicles for Dynamic Site Layout Planning in Large-Scale Construction Projects
    Hammad, Ahmed W. A.
    da Costa, Bruno B. F.
    Soares, Carlos A. P.
    Haddad, Assed N.
    BUILDINGS, 2021, 11 (12)
  • [7] Motorway Construction Site as Large-Scale Earthworks Site.
    Kolbe, Peter
    BMT. Baumaschine + Bautechnik, 1987, 34 (7-8): : 324 - 330
  • [8] Site specificity in contemporary large-scale harbour transformation projects
    Braae, Ellen
    Diedrich, Lisa
    JOURNAL OF LANDSCAPE ARCHITECTURE, 2012, 7 (01) : 20 - 33
  • [9] Measuring the maturity of risk management in large-scale construction projects
    Jia, Guangshe
    Ni, Xiaochuan
    Chen, Zhen
    Hong, Baonan
    Chen, Yuting
    Yang, Fangjun
    Lin, Chen
    AUTOMATION IN CONSTRUCTION, 2013, 34 : 56 - 66
  • [10] Dynamic conflict management in large-scale design and construction projects
    Ng, Helen S.
    Pena-Mora, Feniosky
    Tamaki, Tadatsugu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (02) : 52 - 66