A fuzzy multi-criteria approach for critical path definition

被引:57
作者
Zammori, Francesco A. [1 ]
Braglia, Marcello [1 ]
Frosolini, Marco [1 ]
机构
[1] Univ Pisa, Dipartimento Ingn Meccan Nucl & Prod, Fac Ingn, I-56126 Pisa, Italy
关键词
Critical path; Fuzzy PERT; MCDM; TOPSIS; PLANT LOCATION; TOPSIS METHOD; NETWORK; SENSITIVITY; PERT;
D O I
10.1016/j.ijproman.2008.03.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper focuses on the identification of the critical path in complex projects networks. To extend the capabilities of the traditional project-scheduling approaches an innovative framework is presented, which integrates Fuzzy Logic and Multi Criteria Decision Making (MCDM) techniques. The aim is to determine the critical path taking into account not only the expected duration of the tasks, but also additional critical parameters such as: 'duration variability', 'costs', 'shared resources', 'risk of major design revisions' and 'external risks'. To this scope, all the previously mentioned parameters are evaluated following a mathematical approach based on Fuzzy Logic and are aggregated using the 'Technique for Order Preference by Similarity to Ideal Solution' (TOPSIS) to de. ne the resulting critical path. An example concerning an engineering project is also presented to better explain the potentials and the capabilities of the proposed approach. (c) 2008 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:278 / 291
页数:14
相关论文
共 44 条
  • [1] Ahuja H.N., 1994, PROJECT MANAGEMENT, V2nd
  • [2] Al-Subhi Al-Harbi K. M., 2001, International Journal of Project Management, V19, P19, DOI 10.1016/S0263-7863(99)00038-1
  • [3] [Anonymous], 1993, INTRO FUZZY CONTROL, DOI DOI 10.1007/978-3-662-11131-4
  • [4] [Anonymous], 1988, FUZZY MATH MODELS EN
  • [5] Where do we stand with fuzzy project scheduling?
    Bonnal, P
    Gourc, D
    Lacoste, G
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 114 - 123
  • [6] BUCKLEY JJ, 1989, APPL FUZZY SET METHO, P103
  • [7] Cagno E., 2001, International Journal of Project Management, V19, P313, DOI 10.1016/S0263-7863(00)00020-X
  • [8] On the sure criticality of tasks in activity networks with imprecise durations
    Chanas, S
    Dubois, D
    Zielinski, P
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2002, 32 (04): : 393 - 407
  • [9] Critical path analysis in the network with fuzzy activity times
    Chanas, S
    Zielinski, P
    [J]. FUZZY SETS AND SYSTEMS, 2001, 122 (02) : 195 - 204
  • [10] THE USE OF FUZZY VARIABLES IN PERT
    CHANAS, S
    KAMBUROWSKI, J
    [J]. FUZZY SETS AND SYSTEMS, 1981, 5 (01) : 11 - 19