Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system

被引:10
|
作者
Bylka, Stanislaw [1 ]
机构
[1] Polish Acad Sci, Inst Comp Sci, PL-01237 Warsaw, Poland
关键词
Supply chain; Constrained game; Equilibrium strategies; INTEGRATED INVENTORY MODEL; RETAILER SUPPLY CHAINS; DISCOUNT PRICING MODEL; GAME-THEORY; POLICIES; PROFITS; DEMAND; JIT;
D O I
10.1016/j.ijpe.2008.08.032
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a decentralized dynamic production-distribution control. A discrete deterministic model in which a vendor produces a product and supplies it to the buyer is considered. Several papers on vendor-buyer integrated production inventory management assume that policies are set by a central decision maker to optimize total system performance. Although vendor and buyer may agree to minimize the total cost, at least one of them has a private incentive to deviate from the agreement. In the competitive situation, the objective is to determine schedules which minimize the individual average total cost of production, shipment and stockholding. We assume that the division of shipment costs is centrally coordinated or negotiated initially. It leads to a class of non-cooperative constrained games, indexed by two parameters connected with partitions of shipment costs. Non-cooperative strategies are considered as feasible strategies in a restricted non-cooperative game. Some properties of equilibrium strategies are investigated as acceptable equilibrium strategies of subgames in the game. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:243 / 252
页数:10
相关论文
共 50 条
  • [1] Non-cooperative strategies for production and shipment lot sizing in one vendor-multi-buyer system
    Bylka, Stanislaw
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 131 (01) : 372 - 382
  • [2] Competitive and cooperative policies for the vendor-buyer system
    Bylka, S
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 : 533 - 544
  • [3] Vendor-buyer inventory models with trade credit financing under both non-cooperative and integrated environments
    Teng, Jinn-Tsair
    Chang, Chun-Tao
    Chern, Maw-Sheng
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (11) : 2050 - 2061
  • [4] Vendor-buyer lot sizing problem with stochastic demand: an exact procedure under service level approach
    Ertogral, Kadir
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2011, 5 (01) : 101 - 110
  • [5] An integrated vendor-buyer cooperative inventory model in an imperfect production process with shortage backordering
    Hsu, Jia-Tzer
    Hsu, Lie-Fern
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (1-4) : 493 - 505
  • [6] The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: A simple derivation
    Teng, Jinn-Tsair
    Eduardo Cardenas-Barron, Leopoldo
    Lou, Kuo-Ren
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (12) : 5972 - 5977
  • [7] Integrated Vendor-Buyer Lot-Sizing Model with Transportation and Quality Improvement Consideration under Just-in-Time Problem
    Leuveano, Raden Achmad Chairdino
    Ab Rahman, Mohd Nizam
    Mahmood, Wan Mohd Faizal Wan
    Saleh, Chairul
    MATHEMATICS, 2019, 7 (10)
  • [8] Applications of production and delivery concept to vendor-buyer coordination problem
    Yeh, Chun-Wu
    Fu, Yen-Chen
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [9] An integrated inventory models under cooperative and non-cooperative seller-buyer and vendor supply chain
    Shahrjerdi, Reza
    Anuar, Mohd Khairol
    Mustapha, F.
    Ismail, N.
    Esmaeili, M.
    AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (20): : 8361 - 8367
  • [10] Cooperative Vendor-Buyer Model with Imperfect Quality, Inspection Errors, and Shortage Backordering
    Sulistyanto, Rahmad
    Jauhari, Wakhid Ahmad
    Laksono, Pringgo Widyo
    PROCEEDING JOINT INTERNATIONAL CONFERENCE ON ELECTRIC VEHICULAR TECHNOLOGY AND INDUSTRIAL, MECHANICAL, ELECTRICAL, AND CHEMICAL ENGINEERING (ICEVT & IMECE), 2015, : 183 - 188