Flexible Job-shop Scheduling Problem with Sequence-dependent Setup Times using Genetic Algorithm

被引:6
|
作者
Azzouz, Ameni [1 ]
Ennigrou, Meriem [1 ]
Ben Said, Lamjed [1 ]
机构
[1] Univ Tunis, Inst Super Gest, Lab SOIE, Strategies Optimisat & Informat IntelligentE,IS, Tunis, Tunisia
来源
PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2 (ICEIS) | 2016年
关键词
Job-shop Scheduling Problem; Flexible Manufacturing Systems; Sequence-dependent Setup Times; Genetic Algorithms; TABU SEARCH; ANT COLONY;
D O I
10.5220/0005821900470053
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Job shop scheduling problems (JSSP) are among the most intensive combinatorial problems studied in literature. The flexible job shop problem (FJSP) is a generalization of the classical JSSP where each operation can be processed by more than one resource. The FJSP problems cover two difficulties, namely, machine assignment problem and operation sequencing problem. This paper investigates the flexible job-shop scheduling problem with sequence-dependent setup times to minimize two kinds of objectives function: makespan and bi-criteria objective function. For that, we propose a genetic algorithm (GA) to solve this problem. To evaluate the performance of our algorithm, we compare our results with other methods existing in literature. All the results show the superiority of our GA against the available ones in terms of solution quality.
引用
收藏
页码:47 / 53
页数:7
相关论文
共 50 条
  • [41] Improved genetic algorithm for the job-shop scheduling problem
    Tung-Kuan Liu
    Jinn-Tsong Tsai
    Jyh-Horng Chou
    The International Journal of Advanced Manufacturing Technology, 2006, 27 : 1021 - 1029
  • [43] An Improved Genetic Algorithm for the Job-Shop Scheduling Problem
    Hong, Hui
    Li, Tianying
    Wang, Hongtao
    DCABES 2008 PROCEEDINGS, VOLS I AND II, 2008, : 621 - +
  • [44] Improved genetic algorithm for the job-shop scheduling problem
    Liu, TK
    Tsai, JT
    Chou, JH
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (9-10): : 1021 - 1029
  • [45] Hybrid Estimation of Distribution Algorithm for Blocking Flow-Shop Scheduling Problem with Sequence-Dependent Setup Times
    Zhang, Zi-Qi
    Qian, Bin
    Liu, Bo
    Hu, Rong
    Zhang, Chang-Sheng
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 628 - 637
  • [46] An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached/detached setup, machine release date and lag-time
    Defersha, Fantahun M.
    Rooyani, Danial
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147 (147)
  • [47] Scheduling flexible flow lines with sequence-dependent setup times
    Kurz, ME
    Askin, RG
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (01) : 66 - 82
  • [48] Genetic algorithms for a job-shop scheduling problem
    Nakagami, M
    Ishida, M
    KAGAKU KOGAKU RONBUNSHU, 1997, 23 (02) : 175 - 180
  • [49] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Ziaee, Mohsen
    JOURNAL OF SUPERCOMPUTING, 2014, 67 (01): : 69 - 83
  • [50] A new hybrid parallel genetic algorithm for the job-shop scheduling problem
    Spanos, Athanasios C.
    Ponis, Stavros T.
    Tatsiopoulos, Ilias P.
    Christou, Ioannis T.
    Rokou, Elena
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2014, 21 (03) : 479 - 499