Optimal joint-dispatch of energy and reserve for CCHP-based microgrids

被引:83
作者
Wang, Jianxiao [1 ]
Zhong, Haiwang [1 ]
Xia, Qing [1 ]
Kang, Chongqing [1 ]
Du, Ershun [1 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, State Key Lab Control & Simulat Power Syst & Gene, Beijing, Peoples R China
关键词
WIND POWER; OPERATION; STRATEGY; SYSTEM;
D O I
10.1049/iet-gtd.2016.0656
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
With the rapid growth of distributed energy resources (DERs) and microgrids (MGs), the volatility of renewable generations will impact the economical and secure operation of the power system. To exert the grid-friendly manner of MGs, an optimal joint-dispatch scheme of energy and reserve is proposed in this study for combined cooling, heating and power (CCHP)-based MGs. In the scheme, the total operation cost of the MG is minimized under pre-defined reserve requirements. The energy demands are satisfied via dispatching various DERs. Distinguished from the electric demand balanced at any given instant, the unbalance between thermal supply and demand is acceptable because the temperatures can be maintained due to the thermal inertia. When the electric supply is in shortage, the energy provided for the thermal systems can be temporarily reduced so that more energy can be utilised to support the electrical systems. The dynamics of the MG is modelled by discretising thermal balance differential equations. With the coordination of CCHP systems, the reserve capability of the MG is fully utilised, thereby ensuring the security of the bulk power system. Case studies based on an industrial park in Chicago, USA validate that the proposed scheme can provide more reserve capability.
引用
收藏
页码:785 / 794
页数:10
相关论文
共 16 条
[1]   Stochastic Scheduling of Renewable and CHP-Based Microgrids [J].
Alipour, Manijeh ;
Mohammadi-Ivatloo, Behnam ;
Zare, Kazem .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2015, 11 (05) :1049-1058
[2]   A Multi Time-Scale and Multi Energy-Type Coordinated Microgrid Scheduling Solution-Part I: Model and Methodology [J].
Bao, Zhejing ;
Zhou, Qin ;
Yang, Zhihui ;
Yang, Qiang ;
Xu, Lizhong ;
Wu, Ting .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (05) :2257-2266
[3]   Sizing of Energy Storage for Microgrids [J].
Chen, S. X. ;
Gooi, H. B. ;
Wang, M. Q. .
IEEE TRANSACTIONS ON SMART GRID, 2012, 3 (01) :142-151
[4]   Parameter Estimation of a Multistate Model for an Aging Piece of Equipment under Condition-Based Maintenance [J].
Duan, Qihong ;
Chen, Xiang ;
Zhao, Dengfu ;
Zhao, Zheng .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
[5]   Optimal Bidding Strategy for Microgrids Considering Renewable Energy and Building Thermal Dynamics [J].
Duong Tung Nguyen ;
Le, Long Bao .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (04) :1608-1620
[6]   A Novel Optimal Operational Strategy for the CCHP System Based on Two Operating Modes [J].
Fang, Fang ;
Wang, Qing H. ;
Shi, Yang .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :1032-1041
[7]   Optimal short-term scheduling of a novel tri-generation system in the presence of demand response programs and battery storage system [J].
Jabari, F. ;
Nojavan, S. ;
Ivatloo, B. Mohammadi ;
Sharifian, M. B. Bannae .
ENERGY CONVERSION AND MANAGEMENT, 2016, 122 :95-108
[8]  
Lasseter RH, 2002, 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, P305, DOI 10.1109/PESW.2002.985003
[9]   Load Forecasting and Operation Strategy Design for CCHP Systems Using Forecasted Loads [J].
Liu, Mingxi ;
Shi, Yang ;
Fang, Fang .
IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2015, 23 (05) :1672-1684
[10]   Performance analysis of CCHP and CHP systems operating following the thermal and electric load [J].
Mago, P. J. ;
Fumo, N. ;
Chamra, L. M. .
INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2009, 33 (09) :852-864