Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups

被引:13
作者
Ang, Adeline T. H. [1 ]
Sivakumar, Appa Iyer [1 ]
Qi, Chao [2 ]
机构
[1] Nanyang Technol Univ, Syst & Engn Management Div, Sch Mech & Prod Engn, Singapore 639798, Singapore
[2] Nanyang Technol Univ, Singapore MIT Alliance, Singapore 637460, Singapore
关键词
Dynamic scheduling; Multiobjectives; Sequence-dependent setup; Single machine; MANUFACTURING SYSTEMS; TIMES; TARDINESS; MINIMIZE; MODEL; RULE; JOBS; FMS;
D O I
10.1016/j.cie.2008.07.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Fertile opportunities exist for research involving dynamic and stochastic scheduling with multiple conflicting objectives and sequence-dependent setups as little has been reported in the literature to date. This research focuses on understanding and identifying the criteria that could be combined into a single rule using the linear weighted aggregation approach to consider the contradicting needs of cycle time and delivery accuracy. Eight dispatching criteria are compared and evaluated using discrete event simulation. In most studies, the basic concept is to combine different dispatching criterion that performs the best in each objective into a single rule but this may be insufficient. Simulation results show that it is necessary to take into account not only the criterion's strength in optimizing a performance objective but also the degree of trade-off it has on the other conflicting performance objectives of interest. A correlation analysis of the objectives used is also presented. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1223 / 1231
页数:9
相关论文
共 27 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]  
[Anonymous], 2006, Simulation modeling and analysis
[3]  
Baker K. R., 1974, Introduction to Sequencing and Scheduling"
[4]  
Dabbas R.M., 1999, THESIS ARIZONA STATE
[5]   A combined dispatching criteria approach to scheduling semiconductor manufacturing systems [J].
Dabbas, RM ;
Chen, HN ;
Fowler, JW ;
Shunk, D .
COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 39 (3-4) :307-324
[6]  
Deb K., 2010, MULTIOBJECTIVE OPTIM
[7]   Response surface approximation of Pareto optimal front in multi-objective optimization [J].
Goel, Tushar ;
Vaidyanathan, Rajkumar ;
Haftka, Raphael T. ;
Shyy, Wei ;
Queipo, Nestor V. ;
Tucker, Kevin .
COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 2007, 196 (4-6) :879-893
[8]   Single machine scheduling with multiple objectives in semiconductor manufacturing [J].
Gupta, AK ;
Sivakumar, AI .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (9-10) :950-958
[9]  
GUPTA AK, 2006, THESIS NANYANG TU SI