Joint optimization of maintenance, buffer, and spare parts for a production system

被引:39
|
作者
Gan, Shuyuan [1 ,2 ,3 ]
Zhang, Zhisheng [2 ]
Zhou, Yifan [2 ]
Shi, Jinfei [4 ]
机构
[1] Jiangsu Univ, Dept Mech Engn, Zhenjiang 212013, Peoples R China
[2] Southeast Univ, Dept Mech Engn, Nanjing 211189, Jiangsu, Peoples R China
[3] Xuzhou Inst Technol, Jiangsu Key Lab Large Engn Equipment Detect & Con, Xuzhou 221078, Peoples R China
[4] Nanjing Inst Technol, Nanjing 211189, Jiangsu, Peoples R China
基金
高等学校博士学科点专项科研基金; 中国国家自然科学基金;
关键词
Maintenance; Spare part; Buffer; Mathematical analysis; Optimization; Genetic algorithm; OF-N SYSTEM; PREVENTIVE MAINTENANCE; BLOCK-REPLACEMENT; REPAIR CAPACITY; PRODUCTION UNIT; LIMITED SPARES; INVENTORY; POLICY; AVAILABILITY;
D O I
10.1016/j.apm.2015.01.035
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintenance research catches growing attention for its increasing importance in reality. Spare parts and intermediate buffer are two important factors related to maintenance activity, and both of them may greatly influence the system cost. Although some researchers have considered maintenance and buffer inventory, or maintenance and spare parts inventory together, the joint optimization of the three has not been considered before. This paper is focused on the interaction between maintenance, buffer inventory, and spare parts inventory, to achieve the minimization of the long-term expected cost rate for a production system. The investigated production system of the paper consists of two serial machines, an intermediate buffer, and a spare part inventory. The practical example for this type of system can be an automated work center or an automobile general assembly. The cost model that represents the long-term expected cost rate is developed by mathematical analysis. Four control variables corresponding to decisions made on maintenance, buffer, and spare parts are included. Then by using the genetic algorithm method, the cost model is optimized. The proposed method is applied to different simulation cases to show its efficiency and necessity. Additionally, the related optimization results indicate that the joint optimization can effectively alleviate the influence caused by the change of buffer accumulation speed. (C) 2015 Elsevier Inc. All rights reserved.
引用
收藏
页码:6032 / 6042
页数:11
相关论文
共 50 条
  • [31] Joint Optimization of Maintenance and Spare Parts Inventory for Multi-Unit Systems With a Generalized Structure
    Yan, Tao
    Lei, Yaguo
    Li, Naipeng
    Pintelon, Liliane
    Dewil, Reginald
    JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2023, 145 (04):
  • [32] A Review on Joint Optimization of Maintenance with Production Planning and Spare Part Inventory Management
    Hwang, J. Q.
    Samat, H. A.
    INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN INDUSTRIAL ENGINEERING AND MANUFACTURING, 2019, 530
  • [33] Joint optimization of performance-based contracting, condition-based maintenance and spare parts inventory for degrading production systems
    Wang, Yukun
    Gao, Weizheng
    Li, Xiaopeng
    Liu, Yiliu
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 243
  • [34] Exact and heuristic approaches for joint maintenance and spare parts planning
    Bulbul, Pinar
    Bayindir, Z. Pelin
    Bakal, Ismail Serdar
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 129 : 239 - 250
  • [35] Joint optimization of preventive maintenance and spare parts inventory using genetic algorithms and particle swarm optimization algorithm
    Samal N.K.
    Pratihar D.K.
    International Journal of System Assurance Engineering and Management, 2015, 6 (3) : 248 - 258
  • [36] Joint optimization of spare parts supply-demand for k/N(G) system under condition-based maintenance
    Yang J.
    Han M.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (09): : 2148 - 2156
  • [37] Joint Optimization of Preventive Maintenance, Spare Parts Inventory and Transportation Options for Systems of Geographically Distributed Assets
    Wang, Keren
    Djurdjanovic, Dragan
    MACHINES, 2018, 6 (04)
  • [38] NUMBERING SYSTEM SIMPLIFIES MAINTENANCE SPARE PARTS INVENTORY
    LONG, G
    PLANT ENGINEERING, 1979, 33 (06) : 137 - 140
  • [39] Joint Optimization of Maintenance and Spare Parts Inventory Strategies for Emergency Engineering Equipment Considering Demand Priorities
    Wang, Xiaoyue
    Wang, Jingxuan
    Ning, Ru
    Chen, Xi
    MATHEMATICS, 2023, 11 (17)
  • [40] Joint optimization of bi-level imperfect maintenance and spare parts inventory considering order quantity
    He, Yong
    Wang, Hong
    Zhao, Xiujie
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (01) : 261 - 276