Joint optimization of maintenance, buffer, and spare parts for a production system

被引:39
|
作者
Gan, Shuyuan [1 ,2 ,3 ]
Zhang, Zhisheng [2 ]
Zhou, Yifan [2 ]
Shi, Jinfei [4 ]
机构
[1] Jiangsu Univ, Dept Mech Engn, Zhenjiang 212013, Peoples R China
[2] Southeast Univ, Dept Mech Engn, Nanjing 211189, Jiangsu, Peoples R China
[3] Xuzhou Inst Technol, Jiangsu Key Lab Large Engn Equipment Detect & Con, Xuzhou 221078, Peoples R China
[4] Nanjing Inst Technol, Nanjing 211189, Jiangsu, Peoples R China
基金
高等学校博士学科点专项科研基金; 中国国家自然科学基金;
关键词
Maintenance; Spare part; Buffer; Mathematical analysis; Optimization; Genetic algorithm; OF-N SYSTEM; PREVENTIVE MAINTENANCE; BLOCK-REPLACEMENT; REPAIR CAPACITY; PRODUCTION UNIT; LIMITED SPARES; INVENTORY; POLICY; AVAILABILITY;
D O I
10.1016/j.apm.2015.01.035
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintenance research catches growing attention for its increasing importance in reality. Spare parts and intermediate buffer are two important factors related to maintenance activity, and both of them may greatly influence the system cost. Although some researchers have considered maintenance and buffer inventory, or maintenance and spare parts inventory together, the joint optimization of the three has not been considered before. This paper is focused on the interaction between maintenance, buffer inventory, and spare parts inventory, to achieve the minimization of the long-term expected cost rate for a production system. The investigated production system of the paper consists of two serial machines, an intermediate buffer, and a spare part inventory. The practical example for this type of system can be an automated work center or an automobile general assembly. The cost model that represents the long-term expected cost rate is developed by mathematical analysis. Four control variables corresponding to decisions made on maintenance, buffer, and spare parts are included. Then by using the genetic algorithm method, the cost model is optimized. The proposed method is applied to different simulation cases to show its efficiency and necessity. Additionally, the related optimization results indicate that the joint optimization can effectively alleviate the influence caused by the change of buffer accumulation speed. (C) 2015 Elsevier Inc. All rights reserved.
引用
收藏
页码:6032 / 6042
页数:11
相关论文
共 50 条
  • [1] Maintenance optimization of a production system considering defect prevention and spare parts ordering
    Gan, Shuyuan
    Zhang, Xinzhou
    Chen, Lan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2022, 236 (05) : 893 - 906
  • [2] MAINTENANCE OPTIMIZATION FOR A PRODUCTION SYSTEM WITH INTERMEDIATE BUFFER AND REPLACEMENT PART ORDER CONSIDERED
    Gan, Shuyuan
    Shi, Jinfei
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2014, 16 (01): : 140 - 149
  • [3] An Optimal Policy for Maintenance, Intermediate Buffer, and Spare Parts
    Gan, Shuyuan
    Zhang, Zhisheng
    Zhou, Yifan
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 643 - 648
  • [4] The influence of spare parts provisioning on buffer size in a production system
    Kiesmueller, Gudrun P.
    Zimmermann, Julia
    IISE TRANSACTIONS, 2018, 50 (05) : 367 - 380
  • [5] Joint Optimization for Replacement and Spare Parts Inventory
    Zhao, Jianmin
    Xu, Chang-An
    He, Hou-Bo
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (12B): : 5549 - 5556
  • [6] Joint maintenance and just-in-time spare parts provisioning policy for a multi-unit production system
    Salari, Nooshin
    Makis, Viliam
    ANNALS OF OPERATIONS RESEARCH, 2020, 287 (01) : 351 - 377
  • [7] Joint optimization of maintenance inspection and spare provisioning for aircraft deteriorating parts
    Cai, Jing
    Li, Xin
    Chen, Xi
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2017, 28 (06) : 1133 - 1140
  • [8] A stochastic model for joint spare parts inventory and planned maintenance optimisation
    Wang, Wenbin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 216 (01) : 127 - 139
  • [9] Ecological and joint optimization of preventive maintenance and spare parts inventories for an optimal production plan
    Kader, Ba
    Sofiene, Dellagi
    Nidhal, Rezg
    Walid, Erray
    IFAC PAPERSONLINE, 2015, 48 (03): : 2139 - 2144
  • [10] Joint Optimization of Preventive Maintenance and Spare Parts Ordering Considering Imperfect Detection
    He, Yuanchang
    Gao, Zhenhua
    SYSTEMS, 2023, 11 (09):