Trends in transmission, distribution, and administration costs for US investor-owned electric utilities

被引:26
作者
Fares, Robert L. [1 ,2 ]
King, Carey W. [1 ]
机构
[1] Univ Texas Austin, Energy Inst, 2304 Whitis Ave Stop C2400, Austin, TX 78712 USA
[2] Univ Texas Austin, Dept Mech Engn, Austin, TX 78712 USA
关键词
Transmission; Distribution; Electricity; Economics; DISTRIBUTION-SYSTEMS; GENERATION;
D O I
10.1016/j.enpol.2017.02.036
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper analyzes the cost of transmission, distribution, and administration for U.S. investor-owned electric utilities. We analyze data reported to the Federal Energy Regulatory Commission (FERC) from 1994 to 2014 using linear regression to understand how the number of customers in a utility's territory, annual peak demand, and annual energy sales affect annual TD &A spending. Then, we use Edison Electric Institute data for 1960 to 1992 to show trends in TD &A spending between 1960 and 2014. We find that the number of customers in a utility's territory is the single best predictor for annual TD &A costs. Between 1994 and 2014, the average cost per customer was $119/Customer-Year for transmission, $291/Customer-Year for distribution, and $333/ Customer-Year for utility administration. Total TD &A costs per customer have been approximately $700 $800/Customer-Year since 1960, but the cost per kWh of energy sold was significantly higher in the 1960s because the average customer used less than half as much energy annually versus 2014. Thus, TD &A costs per kWh are likely to increase if kWh energy sales decline in the future unless cost recovery is transitioned to a mechanism not based solely on kWh sales.
引用
收藏
页码:354 / 362
页数:9
相关论文
共 34 条
[1]  
Ackerman E., 2013, TECH REP
[2]  
[Anonymous], 2015, List of designated reference and equivalent methods, P1
[3]  
[Anonymous], 2010, TECH REP
[4]  
[Anonymous], 2015, TECH REP
[5]   ELECTRIC-POWER TRANSMISSION AND DISTRIBUTION-SYSTEMS - COSTS AND THEIR ALLOCATION [J].
BAUGHMAN, ML ;
BOTTARO, DJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1976, 95 (03) :782-790
[6]  
Black & Vetch Holding Company, 2012, TECH REP
[7]  
Blank L., 2014, ELECT J, V27, P31, DOI DOI 10.1016/J.TEJ.2014.04.001
[8]   The economics of fixed cost recovery by utilities [J].
Borenstein S. .
Electricity Journal, 2016, 29 (07) :5-12
[9]  
Borlick R., 2014, TECH REP
[10]  
Burns P., 1996, Bull Econ Res, V48, P41