Guidelines to Aid Project Managers in Conceptualising and Implementing Risk Management in Building Projects

被引:5
作者
Odimabo, Onengiyeofori [1 ]
Oduoza, Chike F. [1 ]
机构
[1] Univ Wolverhampton, Fac Sci & Engn, Wulfruna St, Woverhampton WV1 1LY, England
来源
28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY | 2018年 / 17卷
关键词
Risk management; Construction Projects; Integrated Framework; FRAMEWORK;
D O I
10.1016/j.promfg.2018.10.091
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Risk management has become a critical issue as a result of globalisation and the continued quest for greater returns. Construction organisations most especially in developing countries, approach risk management in building construction projects by using a set of practices that are normally insufficient, produce poor results often, and turn profitable building construction projects into loosing ventures. An integrated risk management approach allows construction organisations to consistently deliver superior performance while proactively managing risk. To address this gap, this paper offers a consolidated risk management system for building projects and provides project managers with guidelines for its proper implementation. In addition to helping project managers in improving risk management capability in building projects, the guideline profiled in this paper may also be of use to practitioners in other project risk management settings. (C) 2018 The Authors. Published by Elsevier B.V.
引用
收藏
页码:515 / 522
页数:8
相关论文
共 23 条
  • [1] The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies
    Adeleke, A. Q.
    Bahaudin, A. Y.
    Kamaruddeen, A. M.
    Bamgbade, J. A.
    Salimon, Maruf Gbadebo
    Khan, Muhammad Waris Ali
    Sorooshian, Shahryar
    [J]. SAFETY AND HEALTH AT WORK, 2018, 9 (01) : 115 - 124
  • [2] Occupational risk of building construction
    Aneziris, O. N.
    Topali, E.
    Papazoglou, I. A.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2012, 105 : 36 - 46
  • [3] [Anonymous], 2021, GUID PROJ MAN BOD KN, V7th
  • [4] Buisson A., 2013, Infrastructure development in Nigeria
  • [5] Frame D., 2003, Managing projects in organisations. How to make the best use of Time, V3rd
  • [6] Frigent E., 2002, PRACTICE PROJECT MAN
  • [7] Frontier Market Intelligence, 2012, FIN BUS NEWS NIG BUS
  • [8] Cause of Construction Delay - Theoretical Framework
    Hamzah, N.
    Khoiry, M. A.
    Arshad, I.
    Tawil, N. M.
    Ani, A. I. Che
    [J]. 2ND INTERNATIONAL BUILDING CONTROL CONFERENCE, 2011, 20
  • [9] A project contingency framework based on uncertainty and its consequences
    Howell, David
    Windahl, Charlotta
    Seidel, Rainer
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (03) : 256 - 264
  • [10] Relationship between total's quality management (TQM) and continuous improvement of international project management (CIIPM)
    Jung, JY
    Wang, YH
    [J]. TECHNOVATION, 2006, 26 (5-6) : 716 - 722