AUTOMATED SIMULATION-BASED WORKPLACE DESIGN THAT CONSIDERS ERGONOMICS AND PRODUCTIVITY

被引:22
作者
Harari, Y. [1 ,2 ]
Bechar, A. [2 ]
Raschke, U. [3 ]
Riemer, R. [1 ]
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, Beer Sheva, Israel
[2] Agr Res Org, Inst Agr Engn, Bet Dagan, Israel
[3] Siemens Prod Lifecycle Management Software Inc, Siemens Ind Sect, Ann Arbor, MI USA
关键词
Workplace Design; Optimisation; Simulation; Ergonomics; Predetermined Time Prediction; MATERIALS HANDLING JOBS; MOTION SIMULATION; TRUNK KINEMATICS; SYSTEM-DESIGN; TASKS; WORK; OPTIMIZATION; PREDICTION; FRAMEWORK; WEIGHT;
D O I
10.2507/IJSIMM16(1)1.355
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When designing a workplace with manual material handling tasks, it is important to consider both production and ergonomics. We developed an automated workplace design methodology that addresses production and ergonomics for tasks involving a handled mass of up to 23 kg. This process combines optimisation and a Digital Human Modelling (DHM) simulation, which yield the production and ergonomic measures. The task cycle time in current DHM simulations is based on Predetermined Motion Time Systems (PMTS). To address reservations about the time prediction accuracy of PMTS, we developed a new time prediction model that takes the influence of the handled mass into consideration. Our model and optimisation process were evaluated by using a case study of a box conveying workplace design. The time prediction model results did indeed agree with the real mass handling behaviour. Three design approaches (objective functions) were compared: considering only production, only ergonomics and both production and ergonomics. Each approach resulted in a different optimal solution.
引用
收藏
页码:5 / 18
页数:14
相关论文
共 38 条
[1]   Trunk kinematics of one-handed lifting, and the effects of asymmetry and load weight [J].
Allread, WG ;
Marras, WS ;
Parnianpour, M .
ERGONOMICS, 1996, 39 (02) :322-334
[2]   New methodological framework to improve productivity and ergonomics in assembly system design [J].
Battini, D. ;
Faccio, M. ;
Persona, A. ;
Sgarbossa, F. .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2011, 41 (01) :30-42
[3]  
Bechar A, 2007, T ASABE, V50, P331, DOI 10.13031/2013.22623
[4]  
Ben-Gal I., 2002, IIE Transactions, V34, P375, DOI 10.1080/07408170208928877
[5]   Computer aided planning and design of manual assembly systems [J].
Braun, WJ ;
Rebollar, R ;
Schiller, EF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2317-2333
[6]   ERGO-MTM model: an integrated approach to set working times based upon standardized working performance and controlled biomechanical load [J].
Caragnano, G. ;
Lavatelli, I .
WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2012, 41 :4422-4427
[7]  
Chaffin D. B., 1972, RES MONOGRAPH
[8]  
Chaffin D.B., 2008, Reviews of Human Factors and Ergonomics, V4, P41, DOI DOI 10.1518/155723408X342844
[9]   Human motion simulation for vehicle and Workplace design [J].
Chaffin, Don B. .
HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING, 2007, 17 (05) :475-484
[10]   Modified method time measurements for ergonomic planning of production systems in the manufacturing industry [J].
Christmansson, M ;
Falck, AC ;
Amprazis, J ;
Forsman, M ;
Rasmusson, L ;
Kadefors, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (17) :4051-4059