Conceptual Design of a Pilot-Scale Pyroprocessing Facility

被引:27
作者
Chang, Yoon Il [1 ]
Benedict, Robert W. [1 ]
Bucknor, Matthew D. [1 ]
Figueroa, Javier [1 ]
Herceg, Joseph E. [1 ]
Johnson, Terry R. [1 ]
Koehl, Eugene R. [1 ]
Lell, Richard M. [1 ]
Park, Young Soo [1 ]
Pope, Chad L. [1 ]
Wiedmeyer, Stanley G. [1 ]
Williamson, Mark A. [1 ]
Willit, James L. [1 ]
James, Reid [2 ]
Meyers, Steve [2 ]
Spaulding, Bryan [2 ]
Underdahl, John [2 ]
Wolf, Mike [2 ]
机构
[1] Argonne Natl Lab, Nucl Engn Div, Lemont, IL 60439 USA
[2] Merrick & Co, Engn Serv, Los Alamos, NM USA
关键词
Pyroprocessing; nuclear fuel cycle; spent fuel management; ELECTROLYTIC REDUCTION; FUEL;
D O I
10.1080/00295450.2018.1513243
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Argonne National Laboratory and Merrick & Company developed the conceptual design of a pilot-scale (100 T/year) pyroprocessing facility for the treatment of used fuel generated by commercial light water reactors and subsequent treatment of waste streams generated during the process. The primary purpose of this study was to perform sufficient engineering for the pilot facility conceptual design so that credible capital and operating cost estimates could be developed. Initial safety, safeguards, and security assessments were also completed to provide a detailed evaluation in these areas that can significantly affect both capital and operating costs. Electrorefining-based pyroprocessing resulted in a compact hot-cell facility with few process equipment systems. The process equipment and support systems were estimated to cost $93 million and the facility $305 million for a project total cost of $398 million. The annual operating cost was estimated at $53 million/year Scaling up to a commercial-scale (400 T/year) was also evaluated and the capital cost was estimated at $911 million with annual operating cost of $90 million/year.
引用
收藏
页码:708 / 726
页数:19
相关论文
共 31 条
[1]  
[Anonymous], 2000, EL TECHN DOE SPENT F
[2]   A study of a nuclear hydrogen production demonstration plant [J].
Chang, Jonghwa ;
Kim, Yong-Wan ;
Lee, Ki-Young ;
Lee, Young-Woo ;
Lee, Won Jae ;
Noh, Jae-Man ;
Kim, Min-Hwan ;
Lim, Hong-Sik ;
Shin, Young-Joon ;
Bae, Ki-Kwang ;
Jung, Kwang-Deog .
NUCLEAR ENGINEERING AND TECHNOLOGY, 2007, 39 (02) :111-122
[3]   Melt Crystallization Process Treatment of LiCl Salt Waste Generated from Electrolytic Reduction Process of Spent Oxide Fuel [J].
Cho, Yung-Zun ;
Ahn, Byung-Gil ;
Eun, Hee-Chul ;
Jung, Jin-Suk ;
Lee, Han-Soo .
ASIAN NUCLEAR PROSPECTS 2010, 2011, 7 :525-528
[4]   CONCENTRATION OF CESIUM AND STRONTIUM ELEMENTS INVOLVED IN A LiCl WASTE SALT BY A MELT CRYSTALLIZATION PROCESS [J].
Cho, Yung-Zun ;
Park, Gil-Ho ;
Lee, Han-Su ;
Kim, In-Tae ;
Han, Dae-Seok .
NUCLEAR TECHNOLOGY, 2010, 171 (03) :325-334
[5]  
Cipiti B. B., 2012, SAND20129303 SAND NA
[6]  
Frigo AA, 2003, P GLOB 2003 NEW ORL, P981
[7]  
Gourishankar K, 2002, LIGHT MET, P1075
[8]   Electrolytic reduction of spent light water reactor fuel - Bench-scale experiment results [J].
Herrmann, Steven ;
Li, Shelly ;
Simpson, Michael .
JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2007, 44 (03) :361-367
[9]   Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea [J].
Kim, Sungki ;
Ko, Wonil ;
Bang, Sungsig .
ENERGIES, 2015, 8 (08) :8775-8797
[10]   Preliminary conceptual design and cost estimation for Korea Advanced Pyroprocessing Facility Plus (KAPF plus ) [J].
Ko, Won Il ;
Lee, Ho Hee ;
Choi, Sungyeol ;
Kim, Sung-Ki ;
Park, Byung Heung ;
Lee, Hyo Jik ;
Kim, In Tae ;
Lee, Han Soo .
NUCLEAR ENGINEERING AND DESIGN, 2014, 277 :212-224