Monitoring and displacements at Heathrow Express Terminal 4 station tunnels

被引:26
作者
Clayton, C. R. I. [1 ]
Van der Berg, J. P.
Thomas, A. H.
机构
[1] Univ Southampton, Sch Civil & Environm Engn, Southampton SO9 5NH, Hants, England
[2] Jones & Wagener, Rivonia, South Africa
[3] Mott MacDonald Ltd, Croydon, England
来源
GEOTECHNIQUE | 2006年 / 56卷 / 05期
关键词
u case history; tunnels;
D O I
10.1680/geot.2006.56.5.323
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A wide variety of instrumentation was deployed during the construction of the sprayed-concrete lined tunnels at Heathrow Express Terminal 4 station. This paper presents data from the in-tunnel displacement monitoring system and for settlements above the tunnels, providing data on instrument survival and performance, and an overall summary of the displacements arising from tunnel excavation.
引用
收藏
页码:323 / 334
页数:12
相关论文
共 15 条
[1]  
Aldrian W, 1997, TUNNELS FOR PEOPLE, VOLS 1 AND 2, P71
[2]  
[Anonymous], 1997, P 14 INT C SOIL MECH
[3]  
Attewell P. B., 1982, Ground Eng, V15, P13
[4]  
British Standards Institution, 1997, 8110 BS
[5]   Instrumentation for monitoring sprayed concrete lined soft ground tunnels [J].
Clayton, CRI ;
Hope, VS ;
Heymann, G ;
van der Berg, JP ;
Bica, AVD .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2000, 143 (03) :119-130
[6]  
Cooper ML, 1998, TUNNELS AND METROPOLISES, VOLS 1 AND 2, P249
[7]  
NEW BM, 1994, P TUNN 94 S I MIN ME, P301
[8]  
Peck R.B., 1969, P 7 INT C SOIL MECH, V3, P225
[9]  
POWELL DB, 1997, P TUNN 98, P565
[10]  
Rankin W J., 1988, P C ENG GEOL UND MOV, V5, P79, DOI DOI 10.1144/GSL.ENG.1988.005.01.06