True triaxial testing of geogrid for high speed railways

被引:39
|
作者
Yu, Z. [1 ]
Woodward, P. K. [2 ]
Laghrouche, O. [1 ]
Connolly, D. P. [2 ]
机构
[1] Heriot Watt Univ, Inst Infrastruct & Environm, Edinburgh, Midlothian, Scotland
[2] Univ Leeds, Inst High Speed Rail & Syst Integrat, Leeds LS2 9JT, W Yorkshire, England
关键词
True triaxial testing rig; Geogrid confinement; Ballasted high speed railway; Railroad track settlement; Cyclic laboratory loading; Subballast-subgrade geogrid; REINFORCED BALLAST; BEHAVIOR; DEFORMATION;
D O I
10.1016/j.trgeo.2019.100247
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This work describes a series of novel experimental tests to determine the potential of geogrids to confine granular layers within ballasted railway lines operating at speeds close to critical velocity. This is important because at low train speeds, vertical stresses are dominant, but when approaching critical velocity conditions, dynamic horizontal stress levels are magnified. Therefore the majority of previous geogrid investigations have been performed assuming constant horizontal stress levels, thus making them more relevant for lower speed lines. To investigate settlement under high relative train speeds, ballasted railway track samples were subject to combined vertical-horizontal cyclic loading. Three areas were explored: (1) the performance benefit from placing geogrid at the ballast-subballast interface, (2) the performance benefit from placing geogrid at the subballast-subgrade interface, (3) the effect of subgrade stiffness on geogrid performance at the subballast-subgrade interface. Testing was performed using a unique large-scale true triaxial apparatus which had the ability to vary stress levels in three Cartesian directions. Compared to the control conditions, the geogrid offered a settlement improvement of approximately 35% when placed at the ballast-subballast interface, and 10-15% when placed at the subballast-subgrade interface. Regarding subgrade CBR, it was found that the geogrid offered the greatest performance benefits when the subgrade was soft. Therefore it was concluded that for the ballasted rail structures under test, when subject to elevated levels of horizontal stress, geogrids reduced settlements compared to non-geogrid solutions.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Geogrid stabilization in ballasted trackbed for high-speed railways
    Zhao, Chuang
    Gao, Zelei
    Luo, Zheng
    Bian, Xuecheng
    Chen, Yunmin
    TRANSPORTATION GEOTECHNICS, 2024, 48
  • [2] Optimal design and application of geogrid for ballasted track stabilization in high-speed railways
    Luo, Zheng
    Liu, Shun
    Bian, Xuecheng
    Zhao, Chuang
    Chen, Yunmin
    GEOTEXTILES AND GEOMEMBRANES, 2025, 53 (03) : 754 - 766
  • [3] Triaxial testing study of expansive soil reinforced with geogrid
    Wang Xie-qun
    Guo Min
    Hu Bo
    ROCK AND SOIL MECHANICS, 2011, 32 (06) : 1649 - 1653
  • [4] Development of a true triaxial testing apparatus
    Reddy, Krishna R.
    Saxena, Surendra K.
    Budiman, Jeffry S.
    Geotechnical Testing Journal, 1992, 15 (02): : 89 - 105
  • [5] HIGH SPEED RUNNING (RAILWAYS)
    JENKINS, HH
    COOMBS, DH
    OWEN, AL
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS, 1970, 47 (NDEC): : 559 - &
  • [6] A TRUE TRIAXIAL CELL FOR TESTING CYLINDRICAL ROCK SPECIMENS
    SMART, BGD
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1995, 32 (03) : 269 - &
  • [7] A Failure Criterion for Rocks Based on True Triaxial Testing
    Chang, Chandong
    Haimson, Bezalel
    ROCK MECHANICS AND ROCK ENGINEERING, 2012, 45 (06) : 1007 - 1010
  • [8] A Failure Criterion for Rocks Based on True Triaxial Testing
    Chandong Chang
    Bezalel Haimson
    Rock Mechanics and Rock Engineering, 2012, 45 : 1007 - 1010
  • [9] Development of a true triaxial testing facility for composite materials
    Welsh, JS
    Adams, DF
    MULTIAXIAL FATIGUE AND DEFORMATION: TESTING AND PREDICTION, 2000, 1387 : 423 - 437
  • [10] Development of high speed in Spanish railways
    Lopez Pita, A., 1600, (27):