共 50 条
[37]
Fuzzy Based Risk Analysis for IT-System and their Infrastructure
[J].
2016 IEEE INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY (EMC),
2016,
:51-56
[40]
Probabilistic analysis of the effect of resource constraints on system safety: Towing failures during the construction of concrete platforms
[J].
PROCEEDINGS OF THE SEVENTH (1997) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL IV, 1997,
1997,
:268-274