A Conceptual Readiness Framework for Statistical Process Control (SPC) Deployment

被引:0
作者
Lim, S. Abdul Halim [1 ]
Antony, J. [1 ]
机构
[1] Univ Strathclyde, Dept Design Mfg & Engn Management, Glasgow, Lanark, Scotland
来源
2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013) | 2013年
关键词
Continuous Improvement; Readiness Framework; Statistical Process Control; MANAGEMENT;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is acknowledged that the benefits of statistical process control (SPC) can be accrued not only in the manufacturing industry but also services industry. However, organizations always face challenges and subsequently some of the SPC projects are doomed to fail and cause more financial loss. Many studies have addressed this problem by providing critical success factors (CSFs) as a solution. However, up to this date no study has yet addressed another important component in the successful SPC deployment, which is the readiness level of a company to deploy SPC. The purpose of this paper is to investigate SPC readiness factors and subsequently challenged to develop an SPC readiness framework (SPCRF). A systematic review was applied and resulted nine journal articles. A conceptual framework consists of nine readiness dimensions in SPC deployment were developed based on selected studies and quality awards models.
引用
收藏
页码:300 / 304
页数:5
相关论文
共 31 条
[1]   Assessing readiness for business process reengineering [J].
Abdolvand, Neda ;
Albadvi, Amir ;
Ferdowsi, Zahra .
BUSINESS PROCESS MANAGEMENT JOURNAL, 2008, 14 (04) :497-511
[2]   TQM readiness level perceived by the administrators working for the central organization of the Ministry of National Education in Turkey [J].
Aksu, MB .
TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2003, 14 (05) :591-604
[3]  
Antony J., 2003, Business Process Management Journal, V9, P473, DOI 10.1108/14637150310484526
[4]  
ANTONY J, 2000, WORK STUDY, V49, P242
[5]  
Appelbaum S.H., 1998, MANAGE DECIS, V36, P289, DOI [DOI 10.1108/00251749810220496, 10.1108/00251749810220496]
[6]   STATISTICAL PROCESS-CONTROL IN PCB MANUFACTURE - WHAT ARE THE LESSONS [J].
DALE, BG ;
SHAW, P .
IEE PROCEEDINGS-A-SCIENCE MEASUREMENT AND TECHNOLOGY, 1992, 139 (04) :182-188
[7]  
Dixon-Woods M., 2006, QUAL RES, V6, P27, DOI [DOI 10.1177/1468794106058867, 10.1177/1468794106058867]
[8]  
Does R., 1997, Internation Journal of Quality Science, V2, P181
[9]   Implementing statistical process control: an organizational perspective [J].
Elg, Mattias ;
Olsson, Jesper ;
Dahlgaard, Jens Jorn .
INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2008, 25 (06) :545-+
[10]  
Elgamail M. A., 1998, INT J TECHNOL MANAGE, V16, P13