Optimization of Life-Cycle Maintenance of Deteriorating Bridges with Respect to Expected Annual System Failure Rate and Expected Cumulative Cost

被引:40
作者
Barone, Giorgio [1 ]
Frangopol, Dan M. [1 ]
Soliman, Mohamed [1 ]
机构
[1] Lehigh Univ, Dept Civil & Environm Engn, Engn Res Ctr Adv Technol Large Struct Syst, ATLSS Ctr, Bethlehem, PA 18015 USA
基金
美国国家科学基金会; 美国国家航空航天局;
关键词
Optimization; Deterioration; Inspection; Maintenance; Bridges; Life cycles; Life-cycle management; Inspection and maintenance planning; Deteriorating structures; Failure rate; Uncertainties; Structural optimization; OPTIMUM INSPECTION; RELIABILITY; CONCRETE; MANAGEMENT; FRAMEWORK; REPAIR;
D O I
10.1061/(ASCE)ST.1943-541X.0000812
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Civil infrastructure systems are subjected to progressive deterioration resulting from multiple mechanical and environmental stressors. This deterioration process is developed under uncertainties related to load effects, structural resistance, and inspection outcomes, among others. In this context, life-cycle optimization techniques provide a rational approach to manage these systems considering uncertainties and several budgetary and safety constraints. This paper proposes a novel optimization procedure for life-cycle inspection and maintenance planning of aging structures. In this procedure, the structural system effects are accounted for by modeling the structure as a series, parallel, or a series-parallel system whose components are subjected to time-dependent deterioration phenomena. Different possible repair options are considered depending on the damage state and the outcomes of each inspection. For each component, essential or preventive maintenance aiming at reducing the system failure rate are performed when inspection results indicate that the prescribed threshold damage levels have been reached or violated. Otherwise, no repair is performed. Optimum inspection and maintenance plans are formulated by minimizing both the expected system failure rate and expected cumulative inspection and maintenance cost over the life-cycle of the structure. The proposed approach is applied to an existing bridge.
引用
收藏
页数:13
相关论文
共 28 条
  • [1] Albrecht P., 1984, National Cooperative Highway Research Program Report 272
  • [2] Ang A. H.-S., 1984, PROBABILITY CONCEPTS, Vii
  • [3] [Anonymous], 2002, THESIS U COLORADO BO
  • [4] Risk-based maintenance - Techniques and applications
    Arunraj, N. S.
    Maiti, J.
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2007, 142 (03) : 653 - 661
  • [5] Baek G., 2009, P 6 INT S NEUR NET 3, P1190
  • [6] Hazard-Based Optimum Lifetime Inspection and Repair Planning for Deteriorating Structures
    Barone, Giorgio
    Frangopol, Dan M.
    [J]. JOURNAL OF STRUCTURAL ENGINEERING, 2013, 139 (12)
  • [7] A probabilistic computational framework for bridge network optimal maintenance scheduling
    Bocchini, Paolo
    Frangopol, Dan M.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (02) : 332 - 349
  • [8] Optimization of the preventive maintenance plan of a series components system
    Caldeira Duarte, Jose A.
    Craveiro, Joao C. Taborda A.
    Trigo, Tomas Pedro
    [J]. INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2006, 83 (04) : 244 - 248
  • [9] Carino N.J., 1999, J PERFORM CONSTR FAC, V13, P96, DOI [10.1061/(ASCE)0887-3828(1999)13:3(96), DOI 10.1061/(ASCE)0887-3828(1999)13:3(96]
  • [10] Application of infrared thermography to the non-destructive testing of concrete and masonry bridges
    Clark, MR
    McCann, DM
    Forde, MC
    [J]. NDT & E INTERNATIONAL, 2003, 36 (04) : 265 - 275