Transient Analysis of Multiproduct Bernoulli Serial Lines With Setups

被引:11
|
作者
Wang, Mengyue [1 ,2 ]
Huang, Hongxuan [1 ]
Li, Jingshan [2 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI 53706 USA
关键词
Bernoulli reliability model; multiproduct; serial line; setup; transient analysis;
D O I
10.1109/TASE.2019.2963145
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Performance analysis of flexible manufacturing systems has received substantial research attention. Most of the studies focus on steady-state behavior. The transient performance, which is critical for system operation, control, and improvement, is less investigated. No analytical method is available to evaluate the transients in flexible lines with unreliable machines, finite buffers, and setup times. In this article, an analytical model is introduced to study the transient performance of multiproduct serial lines with Bernoulli reliability machines and nonnegligible setups during changeovers. To reduce the state-space dimension, an approximation method is introduced to evaluate the performance in two-machine lines, where the sequence of multiple part types in the inventory is approximated by the ratio of product mix. Such an approximation method leads to high precision of production rate estimation. Then, for longer lines, the analysis approach in two-machine lines is used as a building block in an iterative aggregation procedure. Numerical experiments show that the iteration procedure is convergent and results in an acceptable accuracy in performance evaluation. In addition, system properties, such as monotonicity and reversibility, are investigated. Note to Practitioners-Manufacturing systems become more and more flexible, where multiple types of products are made on the same production lines. Although significant efforts have been devoted to studying flexible manufacturing systems (FMSs), most of the research contribute to the steady-state analysis. However, the transient performance is of critical importance for control and improvement of flexible systems, particularly, when the system's setup times cannot be ignored. Therefore, in this article, an analytical method using approximation and aggregation procedures is introduced to evaluate the performance of flexible serial lines with Bernoulli machines and setups. Applying such a method, a long serial line is first decomposed into overlapped two-machine lines and then an iteration procedure is used backward and forward to estimate the line performance. Moreover, even in two-machine lines, the part sequence is approximated by the distribution of part types to reduce computation intensity. Using such a method, the system performance of long multiproduct Bernoulli lines with setups can be evaluated efficiently with an acceptable accuracy, which provides production engineers and managers an effective tool to study the transient performance of FMSs, and design real-time production control and improvement strategies.
引用
收藏
页码:135 / 150
页数:16
相关论文
共 50 条
  • [31] Transient Performance Evaluation of Assembly Systems with Bernoulli Machines
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    IFAC PAPERSONLINE, 2015, 48 (03): : 88 - 93
  • [32] Mathematical formulations for the optimal sequencing and lot sizing in multiproduct synchronous assembly lines
    Camussi, Nelida B.
    Cerda, Jaime
    Cafaro, Diego C.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [33] Dynamic Modeling and Analysis of Bernoulli Production Lines With Small-Lot Orders and Product Quality Problems
    Ma, Chiye
    Jia, Zhiyang
    Zhang, Jianchao
    Duan, Minghao
    Wang, Wei
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2025, 21 (01) : 258 - 266
  • [34] Transient Analysis of Nonuniform Transmission Lines with Composite Simpson's Rule
    Zhao, Jinquan
    Fan, Lina
    Gao, Yan
    Zhou, Hao
    Guo, Xingxin
    2016 12TH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY (ICNC-FSKD), 2016, : 2173 - 2177
  • [35] Solution of eigenproblems for state-space transient analysis of transmission lines
    Mamis, MS
    Köksal, M
    ELECTRIC POWER SYSTEMS RESEARCH, 2000, 55 (01) : 7 - 14
  • [36] Multiproduct CVP analysis based on contribution rules
    González, L
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 73 (03) : 273 - 284
  • [37] Unconditionally Stable Implicit Schemes for Transient Analysis of Lossy Multiconductor Lines
    Stracqualursi, Erika
    Araneo, Rodolfo
    Burghignoli, Paolo
    Lovat, Giampiero
    Celozzi, Salvatore
    IEEE TRANSACTIONS ON ELECTROMAGNETIC COMPATIBILITY, 2021, 63 (02) : 640 - 644
  • [38] A new methodology for the transient analysis of lossy and dispersive multiconductor transmission lines
    Antonini, G
    IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, 2004, 52 (09) : 2227 - 2239
  • [39] Fast transient analysis of incident field coupling to multiconductor transmission lines
    Shinh, GS
    Nakhla, NM
    Achar, R
    Nakhla, MS
    Dounavis, A
    Erdin, I
    IEEE TRANSACTIONS ON ELECTROMAGNETIC COMPATIBILITY, 2006, 48 (01) : 57 - 73
  • [40] Buffer allocation in asynchronous serial production systems with Bernoulli machines during transients
    Chen W.
    Liu H.
    Qi E.
    International Journal of Industrial and Systems Engineering, 2021, 39 (02) : 176 - 204