摘要
Performance analysis of flexible manufacturing systems has received substantial research attention. Most of the studies focus on steady-state behavior. The transient performance, which is critical for system operation, control, and improvement, is less investigated. No analytical method is available to evaluate the transients in flexible lines with unreliable machines, finite buffers, and setup times. In this article, an analytical model is introduced to study the transient performance of multiproduct serial lines with Bernoulli reliability machines and nonnegligible setups during changeovers. To reduce the state-space dimension, an approximation method is introduced to evaluate the performance in two-machine lines, where the sequence of multiple part types in the inventory is approximated by the ratio of product mix. Such an approximation method leads to high precision of production rate estimation. Then, for longer lines, the analysis approach in two-machine lines is used as a building block in an iterative aggregation procedure. Numerical experiments show that the iteration procedure is convergent and results in an acceptable accuracy in performance evaluation. In addition, system properties, such as monotonicity and reversibility, are investigated. Note to Practitioners-Manufacturing systems become more and more flexible, where multiple types of products are made on the same production lines. Although significant efforts have been devoted to studying flexible manufacturing systems (FMSs), most of the research contribute to the steady-state analysis. However, the transient performance is of critical importance for control and improvement of flexible systems, particularly, when the system's setup times cannot be ignored. Therefore, in this article, an analytical method using approximation and aggregation procedures is introduced to evaluate the performance of flexible serial lines with Bernoulli machines and setups. Applying such a method, a long serial line is first decomposed into overlapped two-machine lines and then an iteration procedure is used backward and forward to estimate the line performance. Moreover, even in two-machine lines, the part sequence is approximated by the distribution of part types to reduce computation intensity. Using such a method, the system performance of long multiproduct Bernoulli lines with setups can be evaluated efficiently with an acceptable accuracy, which provides production engineers and managers an effective tool to study the transient performance of FMSs, and design real-time production control and improvement strategies.
引用
收藏
页码:135 / 150
页数:16
相关论文
共 50 条
  • [21] Multi-type products and dedicated buffers-based flexible production process analysis of serial Bernoulli lines
    Chen, Jingchuan
    Jia, Zhiyang
    Huang, Longzhu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
  • [22] Transient analysis and real-time control of geometric serial lines with residence time constraints
    Wang, Feifan
    Ju, Feng
    Kang, Ningxuan
    IISE TRANSACTIONS, 2019, 51 (07) : 709 - 728
  • [23] Detection and Correction of Buffer Occupancy Data Error in Two-Machine Bernoulli Serial Lines
    Zhu, Tianyu
    Zhang, Liang
    2022 IEEE 18TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2022, : 1854 - 1859
  • [24] Minimizing and balancing setups in a serial production system
    Detti, Paolo
    Meloni, Carlo
    Pranzo, Marco
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (24) : 5769 - 5788
  • [25] Transient Fault Analysis in Overhead Transmission Lines
    Parsi, Mahmood
    Crossley, Peter A.
    2018 53RD INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC), 2018,
  • [26] Transient Analysis of an M/M/1 Queue with Bernoulli Vacation and Vacation Interruption
    Vijayashree, K. V.
    Janani, B.
    COMPUTATIONAL INTELLIGENCE, CYBER SECURITY AND COMPUTATIONAL MODELS: MODELS AND TECHNIQUES FOR INTELLIGENT SYSTEMS AND AUTOMATION, 2018, 844 : 214 - 228
  • [27] A novel analysis model for optimization performance of Bernoulli serial production system considering rework processes
    Zhou, Binghai
    Lin, Song
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2020, 234 (1-2) : 295 - 309
  • [28] Modeling of Bernoulli production line with the rework loop for transient and steady-state analysis
    Ge, Yuntian
    Li, Lin
    Wang, Yong
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 44 : 22 - 41
  • [29] Transient Analysis of Dairy Filling and Packing Production Lines
    Wang, Junwen
    Hu, Yao
    Li, Jingshan
    2010 AMERICAN CONTROL CONFERENCE, 2010, : 5308 - 5313
  • [30] Transient analysis of multiconductor lines above a lossy ground
    Rachidi, F
    Nucci, CA
    Ianoz, M
    IEEE TRANSACTIONS ON POWER DELIVERY, 1999, 14 (01) : 294 - 302