Group-shop scheduling with sequence-dependent set-up and transportation times

被引:21
作者
Ahmadizar, Fardin [1 ]
Shahmaleki, Parmis [1 ]
机构
[1] Univ Kurdistan, Dept Ind Engn, Sanandaj, Iran
关键词
Group-shop scheduling; Sequence-dependent set-up times; Transportation times; Makespan; Genetic algorithm; JOB-SHOP; TABU SEARCH; GENETIC ALGORITHM; BOUND METHOD;
D O I
10.1016/j.apm.2014.03.035
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a group-shop scheduling problem (GSSP) with sequence-dependent set-up times (SDSTs) and transportation times. The GSSP provides a general formulation including the job-shop and the open-shop scheduling problems. The consideration of set-up and transportation times is among the most realistic assumptions made in the field of scheduling. In this paper, we study the GSSP with transportation and anticipatory SDSTs, where jobs are released at different times and there are several transporters to carry jobs. The objective is to find a job schedule that minimizes the makespan, that is, the time at which all jobs are completed and transported to the warehouse (or to the customer). The problem is formulated as a disjunctive programming problem and then prepared in a form of mixed integer linear programming (MILP). Due to the non-deterministic polynomial-time hardness (NP-hardness) of the GSSP, large instances cannot be optimally solved in a reasonable amount of time. Therefore, a genetic algorithm (GA) hybridized with an active schedule generator is proposed to tackle large-sized instances. Both Baldwinian and Lamarckian versions of the proposed hybrid algorithm are then implemented and evaluated through computational experiments. (C) 2014 Elsevier Inc. All rights reserved.
引用
收藏
页码:5080 / 5091
页数:12
相关论文
共 32 条
[1]   Minimizing makespan in a group shop with fuzzy release dates and processing times [J].
Ahmadizar, Fardin ;
Zarei, Alireza .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12) :2063-2074
[2]   A novel hybrid genetic algorithm for the open shop scheduling problem [J].
Ahmadizar, Fardin ;
Farahani, Mehdi Hosseinabadi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (5-8) :775-787
[3]   Group shops scheduling with makespan criterion subject to random release dates and processing times [J].
Ahmadizar, Fardin ;
Ghazanfari, Mehdi ;
Ghomi, Seyyed Mohammad Taghi Fatemi .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (01) :152-162
[4]   Application of chance-constrained programming for stochastic group shop scheduling problem [J].
Ahmadizar, Fardin ;
Ghazanfari, Mehdi ;
Ghomi, Seyyed Mohammad Taghi Fatemi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4) :321-334
[5]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[6]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[7]  
[Anonymous], IND SCHEDULING
[8]  
[Anonymous], 2008, INTRO GENETIC ALGORI
[9]  
[Anonymous], 2012, Scheduling
[10]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793