Countering user risk in information system development projects

被引:16
|
作者
Hung, Yu Wen [1 ]
Hsu, Shih-Chieh [1 ]
Su, Zhi-Yuan [2 ]
Huang, Hsieh-Hong [3 ]
机构
[1] Natl Sun Yat Sen Univ, Dept Informat Management, Kaohsiung 80424, Taiwan
[2] Chia Nan Univ Pharm & Sci, Dept Informat Management, Tainan, Taiwan
[3] Natl Taitung Univ, Dept Informat Sci & Management Syst, Taitung, Taiwan
关键词
Information system development (ISD) project; User risk; Risk coping; Risk reduction; MANAGING KNOWLEDGE; CONTINGENCY-MODEL; TEAM PERFORMANCE; PARTICIPATION; SUCCESS; INTEGRATION; COORDINATION; INVOLVEMENT; IMPACT; AGILE;
D O I
10.1016/j.ijinfomgt.2014.02.003
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
User related issues have long been broadly discussed in the information system development (ISD) project research area. In this study, we focus on user risk and identify two risk countering approaches to demonstrate how to deal with user risk and its negative impact on ISD projects. We hypothesize that (1) user risk has a negative impact on project performance, (2) users' bond with the project and the development team can help reduce user risk, and (3) developers' task knowledge and vertical coordination can ease the negative impact of user risk and increase project performance. A quantitative approach with survey data collected from 240 practitioners confirmed our hypotheses. In addition, we interviewed seven developers and three user representatives to complete our understanding of this issue. Implications for academia and practitioners are discussed at the end of this paper. Suggestions for future research directions are also provided. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:533 / 545
页数:13
相关论文
共 50 条
  • [31] Risk Management in Video Game Development Projects
    Schmalz, Marc
    Finn, Aimee
    Taylor, Hazel
    2014 47TH HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2014, : 4325 - 4334
  • [32] User Evaluation on Curriculum Design Information System
    Ling, Thong Chee
    Jusoh, Yusmadi Yah
    Abdullah, Rusli
    Alwi, Nor Hayati
    PROCEEDINGS OF THE 2014 6TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MULTIMEDIA (ICIM), 2014, : 195 - 199
  • [33] Assessing Interface Challenges in Product Development Projects
    Lakemond, Nicolette
    Magnusson, Thomas
    Johansson, Glenn
    Safsten, Kristina
    RESEARCH-TECHNOLOGY MANAGEMENT, 2013, 56 (01) : 40 - 48
  • [34] User advocacy and information system project performance
    Wang, Eric T. G.
    Chang, Jamie Y. T.
    Jiang, Jiunn-Yih J.
    Klein, Gary
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 146 - 154
  • [35] Prioritization of Risk Factors Affecting Information Technology (IT) Projects in Malaysia
    Mun, Sam Yin
    Sorooshian, Shahryar
    QUALITY-ACCESS TO SUCCESS, 2020, 21 (176): : 153 - 158
  • [36] Mitigating risk of failure in information technology projects: Causes and mechanisms
    Schmidt, Jens
    PROJECT LEADERSHIP AND SOCIETY, 2023, 4
  • [37] Balancing Four Factors in System Development Projects
    Subramanian, Girish H.
    Klein, Gary
    Jiang, James J.
    Chan, Chien-Lung
    COMMUNICATIONS OF THE ACM, 2009, 52 (10) : 118 - 121
  • [38] An expert system for new product development projects
    Balachandra, R
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2000, 100 (07) : 317 - 324
  • [39] Development of a Commitment Management System for Construction Projects
    Salazar, Luis A.
    Ballard, Glenn
    Arroyo, Paz
    Alarcon, Luis F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (12)
  • [40] Mitigating the Impact of Member Turnover in Information Systems Development Projects
    Pee, L. G.
    Kankanhalli, A.
    Tan, G. W.
    Tham, G. Z.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2014, 61 (04) : 702 - 716