共 32 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
FORMAL DEVELOPMENT OF LINE-OF-BALANCE TECHNIQUE
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (04)
:689-704
[3]
ARDITI D, 1986, ASCE J CONSTRUCTION, V112, P411
[4]
BIRRELL GS, 1980, J CONSTRUCT DIV-ASCE, V106, P389
[5]
CARR RI, 1974, ASCE J CONSTRUCTION, V100, P403
[6]
APPLICATION OF LINEAR SCHEDULING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1986, 112 (04)
:476-491
[7]
Optimizing resource utilization for repetitive construction projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (01)
:18-27
[9]
Goldberg D. E., 1989, Genetic algorithms in machine learning, search and optimization
[10]
Linear scheduling model: Development of controlling activity path
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (04)
:263-268