One company's experience with design/build: Labor cost risk and profit potential

被引:30
作者
Ernzen, JJ [1 ]
Schexnayder, C [1 ]
机构
[1] Arizona State Univ, Webb Sch Constr, Tempe, AZ 85287 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2000年 / 126卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(2000)126:1(10)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper offers the data from one construction company's experiences with design/build. Specifically, the paper presents an analysis of the company's labor cost risk based on a case study of two similar projects. One project was a typical design/bid/build job and the other was a design/build job. The design/build project experienced consistently greater fluctuations in the labor cost. These fluctuations seem to indicate that it is very difficult to accurately estimate labor costs for design/build projects, thus adding to the risk of such projects. The second half of the paper presents an account of this same company's overall profit experience with design/build work. Profit margins were analyzed using three categories-design/build versus non-design/build, client-specific design/build, and design/build construction types. The design/build projects' average profit margin was 3.5 percentage points greater than that for the non-design/build work.
引用
收藏
页码:10 / 14
页数:5
相关论文
共 7 条
[1]  
*ASCE, 1996, CIVIL ENG, V66, P18
[2]  
*CONSTR IND I, 1997, PROJ DEL SYST CM RIS
[3]  
Pocock J. B., 1996, THESIS U ILLINOIS UR
[4]  
*PRACT MAN ASS, 1995, 1995 PSMJ DES BUILD
[5]  
SMITH DG, 1994, PUBLIC WORKS MAR, P61
[6]  
*Z WHIT ASS, 1997, 1997 DES BUILD SURV
[7]  
1996, ENR MAY, P21