Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results

被引:54
|
作者
Mohanta, Dusmanta Kumar [1 ]
Sadhu, Pradip Kumar
Chakrabarti, R.
机构
[1] Deemed Univ, Birla Inst Technol, Dept Elect & Elect Engn, Ranchi 835215, Bihar, India
[2] Deemed Univ, Indian Sch Mines, Dept Elect Engn, Dhanbad 826004, Bihar, India
[3] Jadavpur Univ, Dept Elect Engn, Kolkata 700032, W Bengal, India
关键词
maintenance scheduling; captive power plant; genetic algorithm (GA); simulated annealing (SA); levelized reserve method; levelized risk method; loss of load probability (LOLP); hybrid GA/SA; confidence interval;
D O I
10.1016/j.ress.2005.11.062
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a comparison of results for optimization of captive power plant maintenance scheduling using genetic algorithm (GA) as well as hybrid GA/simulated annealing (SA) techniques. As utilities catered by captive power plants are very sensitive to power failure, therefore both deterministic and stochastic reliability objective functions have been considered to incorporate statutory safety regulations for maintenance of boilers, turbines and generators. The significant contribution of this paper is to incorporate stochastic feature of generating units and that of load using levelized risk method. Another significant contribution of this paper is to evaluate confidence interval for loss of load probability (LOLP) because some variations from optimum schedule are anticipated while executing maintenance schedules due to different real-life unforeseen exigencies. Such exigencies are incorporated in terms of near-optimum schedules obtained from hybrid GA/SA technique during the final stages of convergence. Case studies corroborate that same optimum schedules are obtained using GA and hybrid GA/SA for respective deterministic and stochastic formulations. The comparison of results in terms of interval of confidence for LOLP indicates that levelized risk method adequately incorporates the stochastic nature of power system as compared with levelized reserve method. Also the interval of confidence for LOLP denotes the possible risk in a quantified manner and it is of immense use from perspective of captive power plants intended for quality power. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:187 / 199
页数:13
相关论文
共 2 条
  • [1] GA/SA-based hybrid techniques for the scheduling of generator maintenance in power systems
    Dahal, KP
    Burt, GM
    McDonald, JR
    Galloway, SJ
    PROCEEDINGS OF THE 2000 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2000, : 567 - 574
  • [2] Optimisation of Safety and Reliability of Captive Power Plant Maintenance Scheduling Using Genetic Algorithm and Simulated Annealing
    Mohanta, Dusmanta Kumar
    Sadhu, Pradip Kumar
    Chakrabarti, Rupendranath
    INTERNATIONAL JOURNAL OF EMERGING ELECTRIC POWER SYSTEMS, 2005, 3 (01):