Flow shop batching and scheduling with sequence-dependent setup times

被引:20
作者
Shen, Liji [1 ]
Gupta, Jatinder N. D. [2 ]
Buscher, Udo [1 ]
机构
[1] Tech Univ Dresden, Dept Business Management & Econ, D-01062 Dresden, Germany
[2] Univ Alabama, Coll Business Adm, Huntsville, AL 35763 USA
关键词
Batching; Scheduling; Tabu search; Setup times; Non-permutation schedules; Makespan; MANUFACTURING CELL; HEURISTIC ALGORITHM; SEARCH ALGORITHM; FAMILY SETUPS; M-MACHINE; N-JOB; PERMUTATION;
D O I
10.1007/s10951-014-0369-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the flow shop batching and scheduling problem where sequence-dependent family setup times are present and the objective is to minimize makespan. We consider violating the group technology assumption by dividing product families into batches. In order to reduce setup times, inconsistent batches are formed on different machines, which lead to non-permutation schedules. To the best of our knowledge, this is the first time that the splitting of job families into inconsistent batches has been considered in a flow shop system. A tabu search algorithm is developed which contains several neighbourhood functions, double tabu lists and a multilevel diversification structure. Compared to the state-of-the-art meta-heuristics for this problem, the proposed tabu search algorithm achieves further improvement when the group scheduling assumption is dropped. Also, various experiments conducted on the benchmark problem instances confirm the benefits of batching. Therefore, it will be prudent for the practitioners to consider adopting inconsistent batches and non-permutation schedules to improve their operational efficiency within a reasonable amount of computational effort.
引用
收藏
页码:353 / 370
页数:18
相关论文
共 29 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times [J].
Angel-Bello, Francisco ;
Alvarez, Ada ;
Pacheco, Joaquin ;
Martinez, Iris .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (04) :797-808
[4]   A single machine scheduling problem with availability constraints and sequence-dependent setup costs [J].
Angel-Bello, Francisco ;
Alvarez, Ada ;
Pacheco, Joaquin ;
Martinez, Iris .
APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) :2041-2050
[5]  
Battiti R., 1994, ORSA Journal on Computing, V6, P126, DOI 10.1287/ijoc.6.2.126
[6]   An integrated tabu search algorithm for the lot streaming problem in job shops [J].
Buscher, Udo ;
Shen, Liji .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (02) :385-399
[7]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[8]  
Cheng TCE, 2000, PROD OPER MANAG, V9, P262, DOI 10.1111/j.1937-5956.2000.tb00137.x
[9]   Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups [J].
França, PM ;
Gupta, JND ;
Mendes, AS ;
Moscato, P ;
Veltink, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :491-506
[10]   An evaluation of group scheduling heuristics in a flow-line manufacturing cell [J].
Frazier, GV .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (04) :959-976