Project valuation when there are two cashflow streams

被引:4
作者
Emhjellen, M
Alaouze, CM
机构
[1] Stavanger Univ Coll, Sch Econ, N-4091 Stavanger, Norway
[2] Univ New S Wales, Sch Econ, Sydney, NSW 2052, Australia
关键词
separate discounting; CAPM; oil projects;
D O I
10.1016/S0140-9883(02)00019-1
中图分类号
F [经济];
学科分类号
02 ;
摘要
Some authors advocate the separate discounting of different cashflows when calculating net present value (NPV). However, some textbooks (Principles of Corporate Finance, Financial Theory and Corporate Policy: 3rd ed.) focus on calculating NPV by discounting the expected net after tax cashflow using the weighted average cost of capital (WACC) as the discount rate. We show that discounting the expected net after tax cashflow of a project using the WACC yields an incorrect project NPV. A new method for calculating project NPV's using a separate cashflow discounting method is proposed and applied to calculating the NPV's of some North Sea oil projects. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:455 / 467
页数:13
相关论文
共 16 条
[1]  
[Anonymous], PRINCIPLES CORPORATE
[2]  
BUTTERS JK, 1987, CASE PROBLEMS FINANC
[3]  
*CENTR BANK NORW, 1994, REPR YIELD GOV CERT
[4]  
Copeland T.E., 1992, FINANCIAL THEORY COR, V3ra
[5]  
Dixit K., 1994, INVESTMENT UNCERTAIN
[6]  
EMHJELLEN M, 1999, 9915 UNSW SCH EC
[7]   RISK-ADJUSTED DISCOUNT RATES AND CAPITAL-BUDGETING UNDER UNCERTAINTY [J].
FAMA, EF .
JOURNAL OF FINANCIAL ECONOMICS, 1977, 5 (01) :3-24
[8]  
*IBB ASS INC, 1989, STOCKS BONDS BILLS I
[9]  
Jacoby H, 1992, ENERGY J, V13, P19, DOI DOI 10.5547/ISSN0195-6574-EJ-V0L13-N02-2
[10]  
Johnsen T, 1991, CRITERIA PROFITABLE