共 50 条
- [41] DETERMINATION OF BUFFER STOCK BETWEEN PREVENTIVE MAINTENANCE ACTIVITIES FOR REPAIRABLE PRODUCTION SYSTEMS INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2021, 28 (06): : 608 - 630
- [42] Effect of Load on Sequential Imperfect Preventive Maintenance and Replacement Schedules of Mechanically Repairable Machines JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2023, 16 (02): : 337 - 356
- [45] Optimization of condition-based maintenance for degradation systems under imperfect maintenance Li, Q. (licheng0001@hotmail.com), 1600, Chinese Society of Astronautics (34): : 316 - 324