共 48 条
A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility
被引:94
作者:

Gong, Guiliang
论文数: 0 引用数: 0
h-index: 0
机构:
Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
Univ Newcastle, Sch Elect Engn & Comp, Callaghan, NSW, Australia Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China

Chiong, Raymond
论文数: 0 引用数: 0
h-index: 0
机构:
Univ Newcastle, Sch Elect Engn & Comp, Callaghan, NSW, Australia Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China

Deng, Qianwang
论文数: 0 引用数: 0
h-index: 0
机构:
Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China

Gong, Xuran
论文数: 0 引用数: 0
h-index: 0
机构:
Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
机构:
[1] Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
[2] Univ Newcastle, Sch Elect Engn & Comp, Callaghan, NSW, Australia
基金:
中国国家自然科学基金;
国家重点研发计划;
关键词:
flexible job shop scheduling;
worker flexibility;
human factors;
single-objective optimisation;
artificial bee colony algorithms;
OPTIMIZATION;
ERGONOMICS;
KNOWLEDGE;
RULES;
D O I:
10.1080/00207543.2019.1653504
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
The traditional flexible job shop scheduling problem (FJSP) considers machine flexibility but not worker flexibility. Given the influence and potential of human factors in improving production efficiency and decreasing the cost in practical production systems, we propose a mathematical model of an extended FJSP with worker flexibility (FJSPW). A hybrid artificial bee colony algorithm (HABCA) is presented to solve the proposed FJSPW. For the HABCA, effective encoding, decoding, crossover and mutation operators are designed, and a new effective local search method is developed to improve the speed and exploitation ability of the algorithm. The Taguchi method of Design of Experiments is used to obtain the best combination of key parameters of the HABCA. Extensive computational experiments carried out to compare the HABCA with some well-performing algorithms from the literature confirm that the proposed HABCA is more effective than these algorithms, especially on large-scale FJSPW instances.
引用
收藏
页码:4406 / 4420
页数:15
相关论文
共 48 条
- [11] Multi-level heterogeneous worker flexibility in a Dual Resource Constrained (DRC) job-shop[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3041 - 3059Felan, JT论文数: 0 引用数: 0 h-index: 0机构: Univ S Carolina, Darla Moore Sch Business, Columbia, SC 29208 USAFry, TD论文数: 0 引用数: 0 h-index: 0机构: Univ S Carolina, Darla Moore Sch Business, Columbia, SC 29208 USA Univ S Carolina, Darla Moore Sch Business, Columbia, SC 29208 USA
- [12] Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm[J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (04) : 493 - 507Gao, Jie论文数: 0 引用数: 0 h-index: 0机构: Xian Jiaotong Univ, Sch Management, Xian 710049, Peoples R China Xian Jiaotong Univ, Sch Management, Xian 710049, Peoples R ChinaGen, Mitsuo论文数: 0 引用数: 0 h-index: 0机构: Xian Jiaotong Univ, Sch Management, Xian 710049, Peoples R ChinaSun, Linyan论文数: 0 引用数: 0 h-index: 0机构: Xian Jiaotong Univ, Sch Management, Xian 710049, Peoples R China
- [13] An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing time[J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 65 : 52 - 67Gao, Kai Zhou论文数: 0 引用数: 0 h-index: 0机构: Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R China Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R ChinaSuganthan, Ponnuthurai Nagaratnam论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R ChinaPan, Quan Ke论文数: 0 引用数: 0 h-index: 0机构: Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200444, Peoples R China Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R ChinaChua, Tay Jin论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Nanyang Dr, Singapore 638075, Singapore Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R ChinaChong, Chin Soon论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Nanyang Dr, Singapore 638075, Singapore Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R ChinaCai, Tian Xiang论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Nanyang Dr, Singapore 638075, Singapore Liaocheng Univ, Sch Comp, Liaochheng 252059, Peoples R China
- [14] Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion[J]. KNOWLEDGE-BASED SYSTEMS, 2016, 109 : 1 - 16Gao, Kai Zhou论文数: 0 引用数: 0 h-index: 0机构: Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R China Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaSuganthan, Ponnuthurai Nagaratnam论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaPan, Quan Ke论文数: 0 引用数: 0 h-index: 0机构: Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaTasgetiren, Mehmet Fatih论文数: 0 引用数: 0 h-index: 0机构: Yasar Univ, Dept Ind Engn, Izmir, Turkey Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaSadollah, Ali论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R China
- [15] A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion[J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (21) : 7652 - 7663Gao, Kai Zhou论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeSuganthan, Ponnuthurai Nagaratnam论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeChua, Tay Jin论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Singapore 638075, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeChong, Chin Soon论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Singapore 638075, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeCai, Tian Xiang论文数: 0 引用数: 0 h-index: 0机构: Singapore Inst Mfg Technol, Singapore 638075, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporePan, Qan Ke论文数: 0 引用数: 0 h-index: 0机构: Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
- [16] An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5896 - 5911Gao, Kai Zhou论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng, Peoples R China Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeSuganthan, Ponnuthurai Nagaratnam论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporePan, Quan Ke论文数: 0 引用数: 0 h-index: 0机构: Liaocheng Univ, Sch Comp, Liaocheng, Peoples R China Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, SingaporeTasgetiren, Mehmet Fatih论文数: 0 引用数: 0 h-index: 0机构: Yasar Univ, Dept Ind Engn, Izmir, Turkey Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
- [17] Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm[J]. IEEE TRANSACTIONS ON CYBERNETICS, 2019, 49 (05) : 1944 - 1955Gao, Kaizhou论文数: 0 引用数: 0 h-index: 0机构: Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R China Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaYang, Fajun论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaZhou, MengChu论文数: 0 引用数: 0 h-index: 0机构: Macau Univ Sci & Technol, Inst Syst Engn, Macau 999078, Peoples R China New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaPan, Quanke论文数: 0 引用数: 0 h-index: 0机构: Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Hubei, Peoples R China Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R ChinaSuganthan, Ponnuthurai Nagaratnam论文数: 0 引用数: 0 h-index: 0机构: Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore Liaocheng Univ, Sch Comp, Liaocheng 252059, Peoples R China
- [18] A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems[J]. KNOWLEDGE-BASED SYSTEMS, 2018, 148 : 115 - 130Gong, Dunwei论文数: 0 引用数: 0 h-index: 0机构: China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R China Qingdao Univ Sci & Technol, Sch Informat Sci & Technol, Qingdao 266061, Peoples R China China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R ChinaHan, Yuyan论文数: 0 引用数: 0 h-index: 0机构: Liaocheng Univ, Sch Comp Sci, Liaocheng 252059, Peoples R China China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R ChinaSun, Jianyong论文数: 0 引用数: 0 h-index: 0机构: Xi An Jiao Tong Univ, Sch Math & Stat, Xian 710049, Shaanxi, Peoples R China China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R China
- [19] A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators[J]. JOURNAL OF CLEANER PRODUCTION, 2018, 174 : 560 - 576Gong, Guiliang论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaDeng, Qianwang论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaGong, Xuran论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaLiu, Wei论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaRen, Qinghua论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
- [20] A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (07) : 2506 - 2522Gong, Xuran论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaDeng, Qianwang论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaGong, Guiliang论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaLiu, Wei论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R ChinaRen, Qinghua论文数: 0 引用数: 0 h-index: 0机构: Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China