A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility

被引:94
作者
Gong, Guiliang [1 ,2 ]
Chiong, Raymond [2 ]
Deng, Qianwang [1 ]
Gong, Xuran [1 ]
机构
[1] Hunan Univ, State Key Lab Adv Design & Mfg Vehicle Body, Changsha, Hunan, Peoples R China
[2] Univ Newcastle, Sch Elect Engn & Comp, Callaghan, NSW, Australia
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
flexible job shop scheduling; worker flexibility; human factors; single-objective optimisation; artificial bee colony algorithms; OPTIMIZATION; ERGONOMICS; KNOWLEDGE; RULES;
D O I
10.1080/00207543.2019.1653504
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The traditional flexible job shop scheduling problem (FJSP) considers machine flexibility but not worker flexibility. Given the influence and potential of human factors in improving production efficiency and decreasing the cost in practical production systems, we propose a mathematical model of an extended FJSP with worker flexibility (FJSPW). A hybrid artificial bee colony algorithm (HABCA) is presented to solve the proposed FJSPW. For the HABCA, effective encoding, decoding, crossover and mutation operators are designed, and a new effective local search method is developed to improve the speed and exploitation ability of the algorithm. The Taguchi method of Design of Experiments is used to obtain the best combination of key parameters of the HABCA. Extensive computational experiments carried out to compare the HABCA with some well-performing algorithms from the literature confirm that the proposed HABCA is more effective than these algorithms, especially on large-scale FJSPW instances.
引用
收藏
页码:4406 / 4420
页数:15
相关论文
共 48 条
  • [1] Dynamic cell formation and the worker assignment problem: a new model
    Aryanezhad, M. B.
    Deljoo, V.
    Mirzapour Al-e-hashem, S. M. J.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (3-4) : 329 - 342
  • [2] Considering skills evolutions in multi-skilled workforce allocation with flexible working hours
    Attia, El-Awady
    Duquenne, Philippe
    Le-Lann, Jean-Marc
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (15) : 4548 - 4573
  • [3] Human related issues in manufacturing cell design, implementation, and operation: a review and survey
    Bidanda, B
    Ariyawongrat, P
    Needy, KL
    Norman, BA
    Tharmmaphornphilas, W
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) : 507 - 523
  • [4] Birch Stephen, 2003, J Health Serv Res Policy, V8, P225, DOI 10.1258/135581903322403290
  • [5] Flexible job shop scheduling with lot streaming and sublot size optimisation
    Bozek, Andrzej
    Werner, Frank
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6391 - 6411
  • [6] Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
  • [7] Cao X, 2011, 4 INT C INT COMP TEC
  • [8] Improved sheep flock heredity algorithm and artificial bee colony algorithm for scheduling m-machine flow shops lot streaming with equal size sub-lot problems
    Chakaravarthy, G. Vijay
    Marimuthu, S.
    Ponnambalam, S. G.
    Kanagaraj, G.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (05) : 1509 - 1527
  • [9] A model for the assignment of a set of tasks when work performance depends on experience of all tasks involved
    Corominas, Albert
    Olivella, Jordi
    Pastor, Rafael
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 335 - 340
  • [10] Deng Q., 2017, Computational Intelligence and Neuroscience, V2017, P1