From First Planner to Last Planner Applying a Capability Model to Measure the Maturity of the Planning Process in ETO

被引:1
作者
Junge, Gabriele Hofinger [1 ]
Kjersem, Kristina [2 ]
Shlopak, Mikhail [3 ]
Alfnes, Erlend [1 ]
Halse, Lise Lillebrygfjeld [2 ]
机构
[1] Norwegian Univ Sci & Technol, N-7034 Trondheim, Norway
[2] Molde Univ Coll, Molde, Norway
[3] Moreforsking Molde AS, Molde, Norway
来源
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II | 2015年 / 460卷
关键词
Maturity model; Project planning; Project management; Engineered-to-order (ETO); MANAGEMENT; ENGINEER;
D O I
10.1007/978-3-319-22759-7_28
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Engineered-to-order (ETO) networks are dynamic and hard to define, and their planning and control functionalities are commonly affected by the actions of suppliers and customers. Frequently, projects experience delays, budget overruns, and quality defects. Consequently, there is a need for project management that synchronizes engineering and production processes throughout the network. The aim of this study is to develop a project planning maturity model (MMPP) in order to improve project performance in ETO manufacturing networks. Moreover, a multiple case study approach is used to test the applicability of the developed maturity model. The results of the case studies from three ETO case companies show that there is (1) no or low degree of standardization of the planning processes, and (2) there is little or no integration between engineering and production planning processes.
引用
收藏
页码:240 / 247
页数:8
相关论文
共 23 条
[1]  
Andersen E. S., 2003, International Journal of Project Management, V21, P457, DOI 10.1016/S0263-7863(02)00088-1
[2]  
[Anonymous], 1992, APPL NEW PRODUCTION
[3]  
[Anonymous], 2000, LAST PLANNER SYSTEM
[4]  
Arica E., 2012, 17 INT WORK SEM PROD
[5]   Developing Maturity Models for IT Management - A Procedure Model and its Application [J].
Becker, Joerg ;
Knackstedt, Ralf ;
Poeppelbuss, Jens .
BUSINESS & INFORMATION SYSTEMS ENGINEERING, 2009, 1 (03) :213-+
[6]   Value of maturity models in performance measurement [J].
Bititci, Umit S. ;
Garengo, Patrizia ;
Ates, Aylin ;
Nudurupati, Sai S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (10) :3062-3085
[7]  
Cook-Davies T., 2002, INT J PROJ MANAG, V2002, P185
[8]  
Ellram L.M., 1996, J BUS LOGIST, V17, P93
[9]  
Emblemsvag J., 2014, J SHIP PROD DES, V30, P1
[10]  
Fleming Q.W., 2002, COST ENG, V44, P32