Simulating quality assurance and efficiency analysis between construction management and engineering geodesy

被引:11
|
作者
Rinke, Nils [1 ]
von Goesseln, Ilka [2 ]
Kochkine, Vitali [3 ]
Schweitzer, Juergen [4 ]
Berkhahn, Volker [1 ]
Berner, Fritz [3 ]
Kutterer, Hansjoerg [5 ]
Neumann, Ingo [2 ]
Schwieger, Volker [4 ]
机构
[1] Leibniz Univ Hannover, Inst Risk & Reliabil, Hannover, Germany
[2] Leibniz Univ Hannover, Geodet Inst, Hannover, Germany
[3] Univ Stuttgart, Inst Construct Management, Stuttgart, Germany
[4] Univ Stuttgart Germany, Inst Engn Geodesy, Stuttgart, Germany
[5] Fed Agcy Cartog & Geodesy, Frankfurt, Germany
关键词
Simulation; Petri-net; Engineering geodesy; Quality assurance; Efficiency optimization;
D O I
10.1016/j.autcon.2017.01.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
High-rise building construction is highly complex and involves many different disciplines. Such projects can only be accomplished efficiently and with appropriate quality by means of an overall optimized construction process. However, the understanding of the term "quality" among involved participants is not always equivalent. E.g. providing required tolerances of elevator shaft walls constantly throughout the concrete works is often a challenging task during the execution of in-situ concrete works. This paper is based on the scientific research project "Efficiency optimization and quality control of engineering geodesy processes in civil engineering" (Effizienzoptimierung and Qualitatssicherung ingenieurgeodatischer Prozesse im Bauwesen - EQuiP), which aimed at developing a method for instant quality assurance in construction based on geodetic surveying techniques, and at the same time optimizing the efficiency of the process, e.g. With respect to time. This paper shows how hierarchical and modular modeling of construction and geodetic processes using high-level Petri nets delivers a base for a real time quality evaluation and re-planning on construction site. As an example, this modeling approach is simulated for the construction of concrete stairs and elevators core of a characteristic high-rise structure. The concrete works were considered to be carried out using climbing form Work. Three different scenarios are shown in this paper. The first scenario is simulated with deterministic durations and validates the developed Petri net. The second scenario uses stochastic process durations to show the robustness of the construction process. Finally, disturbances and delays are integrated and an automated rescheduling based on prioritized alternative paths is used. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:24 / 35
页数:12
相关论文
共 50 条
  • [1] Efficiency optimization and quality control of engineering geodesy processes in civil engineering
    Berkhahn, V.
    Berner, F.
    Kutterer, H.
    Schwieger, V.
    Hirschner, J.
    Rehr, I.
    Rinke, N.
    Schweitzer, J.
    BAUINGENIEUR, 2010, 85 : 491 - 501
  • [2] ENGINEERING QUALITY ASSURANCE FOR CONSTRUCTION GROUND FREEZING
    SHUSTER, JA
    ENGINEERING GEOLOGY, 1981, 18 (1-4) : 333 - 350
  • [3] Technical Assurance for Construction Quality Management
    Jiang, Haohao
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3397 - 3400
  • [4] THE APPLICATION OF QUALITY ASSURANCE TO ENGINEERING MANAGEMENT
    KIDD, GJ
    SECOND INTERNATIONAL CONFERENCE ON ENGINEERING MANAGEMENT: MANAGING TECHNOLOGY IN A COMPETITIVE INTERNATIONAL ENVIRONMENT, 1989, : 95 - 98
  • [5] Development of quality assurance and quality management in civil engineering
    Haste, N.D.
    Proceedings of the Conference on Civil Engineering nhe Nuclear Industry, 1991,
  • [6] Direct Pipe Construction: An Engineering Perspective on Quality Assurance
    Robison, J. L.
    Arens, N. A.
    PIPELINES 2017: PLANNING AND DESIGN, 2017, : 227 - 238
  • [7] Process management for quality assurance in a Faculty of Engineering
    Vivas, Fe Esperanza Vivas
    Alfonso, Yanelis Ramos
    ATENAS, 2025, (63):
  • [9] Quality assurance and quality control of nuclear engineering during construction phase
    Zhang, Zhi-Hua
    Deng, Yue
    Liu, Yao-Guang
    Xu, Xian-Qi
    Zhou, Shan
    Qian, Da-Zhi
    Zhang, Yang
    Hedongli Gongcheng/Nuclear Power Engineering, 2007, 28 (02): : 101 - 104
  • [10] Implementation of quality management and quality assurance in Continuing engineering education
    Xing, PL
    KNOWLEDGE REVOLUTION, THE IMPACT OF TECHNOLOGY ON LEARNING, PROCEEDINGS, 1998, : 535 - 538