摘要
Continuous casting is the central process of steel shaping in the steel industry. Here, liquid steel is transformed into solid cuboid shape using a continuous casting process. In most companies, there are parallel continuous casters, which need to be balanced and scheduled. The production process is order driven. Orders in terms of slabs to be casted are not assigned to a specific caster per se. As a result, production planning has to decide about the assignment of slabs to casters as well as the sequence of slabs on individual casters. Scheduling a single caster has to take four specific requirements into account. These are a material supply in batches, flexible slab specifications, a continuous adjustable casting width and different types of setup. While scheduling of a single caster has been studied recently, approaches taking the assignment of slabs to casters as well as its impact on the individual scheduling task into account are missing. In our contribution we present a planning framework for the problem. The framework consists of a MIP-model formulation and a two stage heuristic solution procedure for given problem instances, the framework is applied to a numerical case study and compared to a lower bound as well as to an industry benchmark. The numerical case study shows, that the framework is always able to obtain feasible solutions of the problem with a better quality than the discussed industry benchmark. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:551 / 562
页数:12
相关论文
共 50 条
  • [41] Application of Extremal Optimization Approach to the Integrated Scheduling Problem of Continuous Casting and Hot Rolling Process
    Pan, Zaisheng
    Wang, Tianlin
    Zhou, Xuanhao
    Chen, Peng
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 2429 - 2434
  • [42] Parallel loop generation and scheduling
    Lotfi, Shahriar
    Parsa, Saeed
    JOURNAL OF SUPERCOMPUTING, 2009, 50 (03) : 289 - 306
  • [43] LIST SCHEDULING OF PARALLEL TASKS
    WANG, QZ
    CHENG, KH
    INFORMATION PROCESSING LETTERS, 1991, 37 (05) : 291 - 297
  • [45] Scheduling of parallel continuous annealing lines with alternative processing modes to optimize efficiency under tardiness constraints
    Wegel, Sebastian
    Ivanov, Anton
    Lenz, Ralf
    Volling, Thomas
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 316 (01) : 282 - 294
  • [46] Scheduling parallel extrusion lines
    Boctor, Fayez F.
    Zaatour, Dhiaeddine
    Renaud, Jacques
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (01) : 1 - 16
  • [47] Modeling and Scheduling a Continuous Casting System - a Logistics Perspective
    Vlad, Radu Constantin
    2024 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION, QUALITY AND TESTING, ROBOTICS, AQTR, 2024, : 311 - 316
  • [48] Production scheduling in a steelmaking-continuous casting plant
    Pacciarelli, D
    Pranzo, M
    COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (12) : 2823 - 2835
  • [49] Continuous Nonlinear Programming Techniques to Solve Scheduling, Problems
    Fagundez, Fabio D.
    Xavier, Adilson E.
    Faco, Joao L. D.
    INFORMATICA, 2009, 20 (02) : 203 - 216
  • [50] A comprehensive solution for continuous casting production planning and scheduling
    Mohammad Reza Yadollahpour
    Behrooz ArbabShirani
    The International Journal of Advanced Manufacturing Technology, 2016, 82 : 211 - 226