Slab scheduling at parallel continuous casters

被引:11
|
作者
Wichmann, Matthias Gerhard [1 ]
Spengler, Thomas Stefan [1 ]
机构
[1] Tech Univ Carolo Wilhelmina Braunschweig, Inst Automot Management & Ind Prod, D-38106 Braunschweig, Germany
关键词
Scheduling; Steel industry; GRASP; LINEAR-PROGRAMMING MODEL; STEEL; STEELMAKING; ALGORITHM; ORDERS; IRON;
D O I
10.1016/j.ijpe.2015.08.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Continuous casting is the central process of steel shaping in the steel industry. Here, liquid steel is transformed into solid cuboid shape using a continuous casting process. In most companies, there are parallel continuous casters, which need to be balanced and scheduled. The production process is order driven. Orders in terms of slabs to be casted are not assigned to a specific caster per se. As a result, production planning has to decide about the assignment of slabs to casters as well as the sequence of slabs on individual casters. Scheduling a single caster has to take four specific requirements into account. These are a material supply in batches, flexible slab specifications, a continuous adjustable casting width and different types of setup. While scheduling of a single caster has been studied recently, approaches taking the assignment of slabs to casters as well as its impact on the individual scheduling task into account are missing. In our contribution we present a planning framework for the problem. The framework consists of a MIP-model formulation and a two stage heuristic solution procedure for given problem instances, the framework is applied to a numerical case study and compared to a lower bound as well as to an industry benchmark. The numerical case study shows, that the framework is always able to obtain feasible solutions of the problem with a better quality than the discussed industry benchmark. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:551 / 562
页数:12
相关论文
共 50 条
  • [21] Measurement of Transient Meniscus Flow in Steel Continuous Casters and Effect of Electromagnetic Braking
    Cho, Seong-Mook
    Lee, Hyoung-Jun
    Kim, Seon-Hyo
    Chaudhary, Rajneesh
    Thomas, Brian G.
    Lee, Duck-Hee
    Kim, Yong-Jin
    Choi, Woong-Ryul
    Kim, Sung-Kwang
    Kim, Hui-Soo
    SENSORS, SAMPLING, AND SIMULATION FOR PROCESS CONTROL, 2011, : 59 - 66
  • [22] A multi-population parallel genetic algorithm for highly constrained continuous galvanizing line scheduling
    Kapanoglu, Muzaffer
    Koc, Ilker Ozan
    HYBRID METAHEURISTICS, PROCEEDINGS, 2006, 4030 : 28 - 41
  • [23] Upset-conscious scheduling for continuous parallel-process and performance decaying unit system
    Chen, Min
    Xu, Qiang
    CHEMICAL ENGINEERING SCIENCE, 2019, 195 : 828 - 840
  • [24] Production planning and scheduling problem of continuous parallel lines with demand uncertain and different production capacities
    Bhosale, Kailash Changdeorao
    Pawar, Padmakar Jagannath
    JOURNAL OF COMPUTATIONAL DESIGN AND ENGINEERING, 2020, 7 (06) : 761 - 774
  • [25] Parallel metaheuristics for the cyclic flow shop scheduling problem
    Bozejko, Wojciech
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 95 : 156 - 163
  • [26] Integrating parts design characteristics and scheduling on parallel machines
    Cevikcan, Emre
    Durmusoglu, M. Bulent
    Baskak, Murat
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (10) : 13232 - 13253
  • [27] Tabu Search for Parallel Machine Scheduling with Job Splitting
    Celik, Cenk
    Saricicek, Inci
    PROCEEDINGS OF THE 2009 SIXTH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY: NEW GENERATIONS, VOLS 1-3, 2009, : 183 - 188
  • [28] Combined scheduling and mapping for scalable computing with parallel tasks
    Duemmler, Joerg
    Rauber, Thomas
    Ruenger, Gudula
    SCIENTIFIC PROGRAMMING, 2012, 20 (01) : 45 - 67
  • [29] Service-oriented robust parallel machine scheduling
    Liu, Ming
    Liu, Xin
    Chu, Feng
    Zheng, Feifeng
    Chu, Chengbin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (12) : 3814 - 3830
  • [30] Parallel dedicated machines scheduling with chain precedence constraints
    Agnetis, Alessandro
    Kellerer, Hans
    Nicosia, Gaia
    Pacifici, Andrea
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (02) : 296 - 305