A novel two-stage evolutionary optimization method for multiyear expansion planning of distribution systems in presence of distributed generation

被引:25
作者
Ahmadigorji, Masoud [1 ]
Amjady, Nima [1 ]
Dehghan, Shahab [2 ]
机构
[1] Semnan Univ, Dept Elect & Comp Engn, Semnan, Iran
[2] Islamic Azad Univ, Qazvin Branch, Dept Elect Biomed & Mechatron Engn, Qazvin, Iran
关键词
Binary modified imperialist competitive algorithm (BMICA); Distributed generation (DG); Distribution system; Improved SSO (ISSO); Multiyear expansion planning; IMPERIALIST COMPETITIVE ALGORITHM; DISTRIBUTION NETWORK EXPANSION; PARTICLE SWARM OPTIMIZATION; DG PLACEMENT; ECONOMIC-DISPATCH; RECONFIGURATION; SEARCH;
D O I
10.1016/j.asoc.2016.09.020
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a new approach for multiyear expansion planning of distribution systems (MEPDS) is presented. The proposed MEPDS model optimally specifies the expansion schedule of distribution systems including reinforcement scheme of distribution feeders as well as sizing and location of distributed generations (DGs) during a certain planning horizon. Moreover, it can determine the optimal timing (i.e. year) of each investment/reinforcement. The objective function of the proposed MEPDS model minimizes the total investment, operation and emission costs while satisfying various technical and operational constraints. In order to solve the presented MEPDS model as a complicated multi-dimensional optimization problem, a new two-stage solution approach composed of binary modified imperialist competitive algorithm (BMICA) and Improved Shark Smell Optimization (ISSO), i.e. BMICA + ISSO, is presented. The performance of the suggested MEPDS model and also two-stage solution approach of BMICA + ISSO is verified by applying them on two distribution systems including a classic 34-bus and a real-world 94 bus distribution system as well as a well-known benchmark function. Additionally, the achieved results of BMICA + ISSO are compared with the obtained results of other two-stage solution methods. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:1098 / 1115
页数:18
相关论文
共 45 条
  • [1] Abedinia O., 2014, COMPLEX J WILEY PUBL, P1
  • [2] Abedinia O, 2015, INT J PR ENG MAN-GT, V2, P245
  • [3] A multiyear DG-incorporated framework for expansion planning of distribution networks using binary chaotic shark smell optimization algorithm
    Ahmadigorji, Masoud
    Amjady, Nima
    [J]. ENERGY, 2016, 102 : 199 - 215
  • [4] A new approach for optimum DG placement and sizing based on voltage stability maximization and minimization of power losses
    Aman, M. M.
    Jasmon, G. B.
    Bakar, A. H. A.
    Mokhlis, H.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2013, 70 : 202 - 210
  • [5] A Multiobjective Particle Swarm Optimization for Sizing and Placement of DGs from DG Owner's and Distribution Company's Viewpoints
    Ameli, Amir
    Bahrami, Shahab
    Khazaeli, Farid
    Haghifam, Mahmood-Reza
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (04) : 1831 - 1840
  • [6] Solution of Optimal Power Flow Subject to Security Constraints by a New Improved Bacterial Foraging Method
    Amjady, Nima
    Fatemi, Hamzeh
    Zareipour, Hamidreza
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1311 - 1323
  • [7] [Anonymous], 2016, IND STAT AN
  • [8] [Anonymous], ENERGY CONVERS MANAG
  • [9] A novel imperialist competitive algorithm for generalized traveling salesman problems
    Ardalan, Zaniar
    Karimi, Sajad
    Poursabzi, Omid
    Naderi, B.
    [J]. APPLIED SOFT COMPUTING, 2015, 26 : 546 - 555
  • [10] Atashpaz-Gargari E, 2007, IEEE C EVOL COMPUTAT, P4661, DOI 10.1109/cec.2007.4425083