An Activity Analysis to Investigate the Root Causes of Worker Productivity Losses in Sri Lankan Building Construction Project

被引:1
作者
Karunarathna, D. M. T. G. N. M. [1 ]
Siriwardana, C. S. A. [1 ]
Dharmawardana, M. Y. R. [1 ]
机构
[1] Univ Moratuwa, Dept Civil Engn, Moratuwa, Sri Lanka
来源
2019 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) / 5TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE | 2019年
关键词
Construction; worker; productivity; Activity Analysis;
D O I
10.1109/mercon.2019.8818942
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction workers are the basic unit of the construction industry. The behaviour of construction workers varies with the time, which impacts on worker productivity. Therefore, obtaining the highest levels of performance is crucial in order to be competitive in the construction industry. The scarcity of skilled workers, increase of high rise building projects and changes in the economic and political conditions aggravated the need of seeking strategies to improve the performances of construction workers. Therefore, it is essential to investigate the productivity pitfalls, and root causes behind the worker performance losses when developing productivity improvement frameworks. Under this study, a detailed workforce assessment framework was developed for building construction projects using the Activity Analysis technique. A worker performance benchmarking was carried out for different trades to identify the differences in contract strategies of the workers. Further, root causes for worker productivity losses were identified and mapped those with the responsible parties.
引用
收藏
页码:412 / 417
页数:6
相关论文
共 10 条
  • [1] [Anonymous], 2010, GUID ACT AN
  • [2] Construction Delay Analysis Techniques, 2013, CONSTRUCTION DELAY A, DOI [10.3390/buildings3030506, DOI 10.3390/BUILDINGS3030506]
  • [3] Dolage R., 2015, PERSPECTIVE, VXLVIII, P21
  • [4] Activity Analysis for Direct-Work Rate Improvement in Construction
    Gouett, Michael C.
    Haas, Carl T.
    Goodrum, Paul M.
    Caldas, Carlos H.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1117 - 1124
  • [5] Karunarathna DMTGNM, 2018, 2018 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) 4TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE, P577, DOI 10.1109/MERCon.2018.8421909
  • [6] Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement
    Nasir, Hassan
    Haas, Carl T.
    Rankin, Jeff H.
    Fayek, Aminah Robinson
    Forgues, Daniel
    Ruwanpura, Janaka
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2012, 39 (09) : 957 - 967
  • [7] Siriwardana Chandana S. A., 2012, Proceedings of the 2012 Construction Research Congress, P179
  • [8] Siriwardana C. S. A, 2016, THESIS
  • [9] Titov Roman, 2014, THESIS
  • [10] Van Truong Luu, 2008, International Journal of Project Management, V26, P758, DOI 10.1016/j.ijproman.2007.10.002