OPTIMAL REPLACEMENT PERIOD WITH REPAIR COST LIMIT AND CUMULATIVE DAMAGE MODEL

被引:0
|
作者
Lai, Min-Tsai [1 ]
机构
[1] Southern Taiwan Univ Sci & Technol, Dept Business Adm, Tainan 710, Taiwan
来源
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY | 2014年 / 16卷 / 02期
关键词
periodical replacement model; cumulative damage model; repair cost limit; minimal repair; GRAPHICAL-METHOD; MINIMAL REPAIR; 2; KINDS; POLICIES; TIME;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with periodical replacement model with single repair cost limit under cumulative damage process. The system is subject to two types of shocks. Type I shock causes damage to the system. The total damage is additive, and it causes a serious failure eventually if the total additive damage exceeds a failure level K. Type II shock causes the system to a minor failure, which can be maintained by minimal repair if the estimated repair cost is smaller than a predetermined repair-cost limit L-S or by preventive replacement if the estimated repair cost is larger than LS. The system is also replaced at scheduled time T or at serious failure. The long-term expected cost per unit time is derived using the expected costs as the optimality criterion. The minimum-cost policy is derived, and existence and uniqueness are proved.
引用
收藏
页码:246 / 252
页数:7
相关论文
共 50 条
  • [1] A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
    Lai, Min-Tsai
    Chen, Shih-Chih
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2016, 41 (05): : 497 - 505
  • [2] OPTIMAL NUMBER OF MINIMAL REPAIRS UNDER A CUMULATIVE DAMAGE MODEL WITH CUMULATIVE REPAIR COST LIMIT
    Lai, Min-Tsai
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2014, 16 (03): : 465 - 471
  • [3] A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
    Min-Tsai Lai
    Shih-Chih Chen
    Sādhanā, 2016, 41 : 497 - 505
  • [4] A periodical replacement model based on cumulative repair-cost limit
    Lai, Min-Tsai
    APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2007, 23 (06) : 455 - 464
  • [5] Optimal age-replacement model with minimal repair based on cumulative repair cost limit and random lead time
    Chien, Y. H.
    Chen, J. A.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 636 - +
  • [6] Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
    Chien, Yu-Hung
    Sheu, Shey-Huei
    Chang, Chin-Chih
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2009, 40 (07) : 703 - 715
  • [7] Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
    Chang, Chin-Chih
    Sheu, Shey-Huei
    Chen, Yen-Luan
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (1-2) : 308 - 317
  • [8] A Periodic Replacement Model Based on Cumulative Repair-Cost Limit for a System Subjected to Shocks
    Sheu, Shey-Huei
    Chang, Chin-Chih
    Chen, Yen-Luan
    Zhang, Zhe George
    IEEE TRANSACTIONS ON RELIABILITY, 2010, 59 (02) : 374 - 382
  • [9] Optimal periodical time for preventive replacement based on a cumulative repair-cost limit and random lead time
    Chien, Y-H
    Chang, C-C
    Sheu, S-H
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2009, 223 (O4) : 333 - 346
  • [10] A bivariate optimal replacement policy with cumulative repair cost limit for a two-unit system under shock damage interaction
    Lai, Min-Tsai
    Chen, Chung-Ho
    Hariguna, Taqwa
    BRAZILIAN JOURNAL OF PROBABILITY AND STATISTICS, 2017, 31 (02) : 353 - 372