共 21 条
[3]
Production lot sizing with process deterioration and machine breakdown under inspection schedule
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
2009, 37 (02)
:257-271
[6]
Hariga M, 1998, NAV RES LOG, V45, P423, DOI 10.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO
[7]
2-7