Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks

被引:22
作者
Chakraborty, T. [1 ]
Giri, B. C. [2 ]
机构
[1] Bethune Coll, Dept Math, Kolkata 700006, India
[2] Jadavpur Univ, Dept Math, Kolkata 700032, India
关键词
Inventory; Production; Inspection; Preventive maintenance; Rework; MACHINE BREAKDOWN; PRODUCTION CYCLE; SCHEDULES; POLICIES; QUALITY;
D O I
10.1007/s12351-013-0134-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper studies the joint effect of shift, inspections, imperfect preventive maintenance (PM) and imperfect rework of defective items on optimal decisions for a deteriorating production system. At the time of inspection during a production run, either PM or restoration is done depending on the state of the production process. There is a probability that PM action may shift the process from 'in-control' state to 'out-of-control' state. During the 'out-of-control' phase, the system produces some defective items which go for rework at the end of the production run. A portion of the reworked items may also fail repairing. The model is formulated for the case of general inspections and analyzed under two well known inspection policies-periodic inspection policy and constant cumulative hazard inspection policy. For numerical examples, a comparison of the outcomes of the model with and without reworks under these two inspection policies is made. It is observed that the periodic inspection policy performs better than the constant cumulative hazard policy.
引用
收藏
页码:29 / 50
页数:22
相关论文
共 21 条
[1]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[2]   Optimizing a production system with rework and equal sized batch shipments [J].
Buscher, Udo ;
Lindner, Gerd .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (02) :515-535
[3]   Production lot sizing with process deterioration and machine breakdown under inspection schedule [J].
Chakraborty, Tulika ;
Giri, B. C. ;
Chaudhuri, K. S. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (02) :257-271
[4]   Production lot sizing with process deterioration and machine breakdown [J].
Chakraborty, Tulika ;
Giri, B. C. ;
Chaudhuri, K. S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :606-618
[5]   Optimal production lot sizing with rework, scrap rate, and service level constraint [J].
Chiu, Singa Wang ;
Ting, Chia-Kuan ;
Chiu, Yuan-Shyi Peter .
MATHEMATICAL AND COMPUTER MODELLING, 2007, 46 (3-4) :535-549
[6]  
Hariga M, 1998, NAV RES LOG, V45, P423, DOI 10.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO
[7]  
2-7
[8]   Production lot sizing with the reworking of imperfect quality items produced [J].
Hayek, PA ;
Salameh, MK .
PRODUCTION PLANNING & CONTROL, 2001, 12 (06) :584-590
[9]   Batching work and rework processes with limited deterioration of reworkables [J].
Inderfurth, K ;
Janiak, A ;
Kovalyov, MY ;
Werner, F .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) :1595-1605
[10]   Optimal manufacturing batch size with rework process at a single-stage production system [J].
Jamal, AMM ;
Sarker, BR ;
Mondal, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 47 (01) :77-89