Integrating GPS and BDS to shorten the initialization time for ambiguity-fixed PPP

被引:50
作者
Liu, Yanyan [1 ,2 ,3 ]
Ye, Shirong [3 ]
Song, Weiwei [3 ]
Lou, Yidong [3 ]
Chen, Dezhong [3 ]
机构
[1] Shenzhen Univ, Coll Civil Engn, Shenzhen Key Lab Spatial Smart Sensing & Serv, Shenzhen 518060, Peoples R China
[2] Shenzhen Univ, Key Lab Geo Environm Monitoring Coastal Zone, Natl Adm Surveying Mapping & GeoInformat, Shenzhen 518060, Peoples R China
[3] Wuhan Univ, 129 Luoyu Rd, Wuhan 430079, Peoples R China
基金
中国国家自然科学基金; 高等学校博士学科点专项科研基金;
关键词
GPS; BeiDou (BDS); Precise point positioning; Ambiguity resolution; Fractional-cycle bias; Initial fixing time; DECORRELATION ADJUSTMENT; RESOLUTION; MODEL;
D O I
10.1007/s10291-016-0525-1
中图分类号
TP7 [遥感技术];
学科分类号
081102 ; 0816 ; 081602 ; 083002 ; 1404 ;
摘要
The main challenge of ambiguity resolution in precise point positioning (PPP) is that it requires 30 min or more to succeed in the first fixing of ambiguities. With the full operation of the BeiDou (BDS) satellite system in East Asia, it is worthwhile to investigate the performance of GPS + BDS PPP ambiguity resolution, especially the improvements of the initial fixing time and ambiguity-fixing rate compared to GPS-only solutions. We estimated the wide- and narrow-lane fractional-cycle biases (FCBs) for BDS with a regional network, and PPP ambiguity resolution was carried out at each station to assess the contribution of BDS. The across-satellite single-difference (ASSD) GPS + BDS combined ambiguity-fixed PPP model was used, in which the ASSD is applied within each system. We used a two-day data set from 48 stations. For kinematic PPP, the percentage of fixing within 10 min for GPS only (Model A) is 17.6 %, when adding IGSO and MEO of BDS (Model B), the percentage improves significantly to 42.8 %, whereas it is only 23.2 % if GEO is added (Model C) due to the low precision of GEO orbits. For static PPP, the fixing percentage is 32.9, 53.3 and 28.0 % for Model A, B and C, respectively. In order to overcome the limitation of the poor precision of GEO satellites, we also used a small network of 10 stations to analyze the contribution of GEO satellites to kinematic PPP. We took advantage of the fact that for stations of a small network the GEO satellites appear at almost the same direction, such that the GEO orbit error can be absorbed by its FCB estimates. The results show that the percentage of fixing improves from 39.5 to 57.7 % by adding GEO satellites.
引用
收藏
页码:333 / 343
页数:11
相关论文
共 38 条
[1]  
[Anonymous], 32 IERS BUND KART GE
[2]  
[Anonymous], EUR NAV C 2011
[3]  
[Anonymous], 1985, P 1 INT S PREC POS G
[4]   Global Mapping Function (GMF): A new empirical mapping function based on numerical weather model data [J].
Boehm, J ;
Niell, A ;
Tregoning, P ;
Schuh, H .
GEOPHYSICAL RESEARCH LETTERS, 2006, 33 (07)
[5]  
Chuang Shi, 2008, Proceedings of the SPIE - The International Society for Optical Engineering, V7285, DOI 10.1117/12.816261
[6]  
Collins P., 2008, Proceedings of ION-GNSS-2008, Savannah, Georgia, USA, September 2008, V16-19, P1315
[7]   GNSS processing at CODE: status report [J].
Dach, Rolf ;
Brockmann, Elmar ;
Schaer, Stefan ;
Beutler, Gerhard ;
Meindl, Michael ;
Prange, Lars ;
Bock, Heike ;
Jaeggi, Adrian ;
Ostini, Luca .
JOURNAL OF GEODESY, 2009, 83 (3-4) :353-365
[8]  
Gabor MJ, 1999, P ION GNSS 12 INT TE, P1569
[9]  
Ge M, 2008, J GEODESY, V82, P389, DOI [10.1007/s00190-007-0208-3, 10.1007/s00190-007-0187-4]
[10]   Towards PPP-RTK: Ambiguity resolution in real-time precise point positioning [J].
Geng, J. ;
Teferle, F. N. ;
Meng, X. ;
Dodson, A. H. .
ADVANCES IN SPACE RESEARCH, 2011, 47 (10) :1664-1673