Applying a resting operation to alleviate bioclogging in vertical flow constructed wetlands: An experimental lab evaluation

被引:48
作者
Hua, Guofen [1 ,2 ]
Zeng, Yitao [1 ]
Zhao, Zhongwei [2 ,3 ]
Cheng, Kaibo [1 ]
Chen, Gang [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydroelect Power, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, State Key Lab Hydrol Water Resource & Hydraul Eng, Nanjing 210098, Jiangsu, Peoples R China
[3] Hohai Univ, Coll Environm, Nanjing 210098, Jiangsu, Peoples R China
关键词
Biofilm; Clogging; Constructed wetlands; Resting operation; SATURATED POROUS-MEDIA; OXYGEN-TRANSFER; BIOFILM GROWTH; WASTE-WATER; REED BEDS; REMOVAL; IMPACT; MODEL; NITRIFICATION; PERMEABILITY;
D O I
10.1016/j.jenvman.2014.01.030
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The aim of this study is to evaluate the effects of and analyze the reasons for applying a resting operation to alleviate biodogging in vertical flow constructed wetlands (VFCWs). In parallel, three groups of laboratory-scale VFCWs were continuously fed with prepared wastewater (BOO = 600 mg/L) at a relatively high hydraulic loading rate of 0.5 m(3)/m(2).d until clogging. Parameters related to the clogging of the wetland substrate before and after resting were examined and measured. The results showed that the resting operation could effectively alleviate bioclogging because the hydraulic conductivity and effective porosity were improved after 3, 7 and 10 days of resting. In the upper 0-10 cm layer, the hydraulic conductivity increased 2.0, 2.6 and 3.5 times, respectively, for the three resting periods. The reduction of the extracellular polymeric substance (EPS), biofilm decay and the consequential change in the biofilm structure are the main reasons that the resting operation relieved clogging. In addition, the observed and theoretical resting times (approximately 7 days) agreed well. The results provide a theoretical basis and technical support for solving clogging problems. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:47 / 53
页数:7
相关论文
共 47 条
  • [11] Hua GF, 2013, APPL ENG AGRIC, V29, P61
  • [12] An integrated model of substrate clogging in vertical flow constructed wetlands
    Hua, G. F.
    Li, L.
    Zhao, Y. Q.
    Zhu, W.
    Shen, J. Q.
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2013, 119 : 67 - 75
  • [13] Clogging pattern in vertical-flow constructed wetlands: Insight from a laboratory study
    Hua, G. F.
    Zhu, W.
    Zhao, L. F.
    Huang, J. Y.
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2010, 180 (1-3) : 668 - 674
  • [14] Applying solubilization treatment to reverse clogging in laboratory-scale vertical flow constructed wetlands
    Hua Guofen
    Zhu Wei
    Zhao Lianfang
    Zhang Yunhui
    [J]. WATER SCIENCE AND TECHNOLOGY, 2010, 61 (06) : 1479 - 1487
  • [15] Processes in vertical-flow reed beds: nitrification, oxygen transfer and soil clogging
    Kayser, K
    Kunst, S
    [J]. WATER SCIENCE AND TECHNOLOGY, 2005, 51 (09) : 177 - 184
  • [16] Kim DS, 2000, BIOTECHNOL BIOENG, V69, P47, DOI 10.1002/(SICI)1097-0290(20000705)69:1<47::AID-BIT6>3.0.CO
  • [17] 2-N
  • [18] Clogging in subsurface-flow treatment wetlands: Occurrence and contributing factors
    Knowles, Paul
    Dotro, Gabriela
    Nivala, Jaime
    Garcia, Joan
    [J]. ECOLOGICAL ENGINEERING, 2011, 37 (02) : 99 - 112
  • [19] Evaluation of substrate clogging processes in vertical flow constructed wetlands
    Langergraber, G
    Haberl, R
    Laber, J
    Pressl, A
    [J]. WATER SCIENCE AND TECHNOLOGY, 2003, 48 (05) : 25 - 34
  • [20] Li HZZ, 2011, WATER SCI TECHNOL, V63, P283, DOI [10.2166/wst.2011.051, 10.2166/wst.2011.454]