Single machine scheduling problem with stochastic sequence-dependent setup times

被引:20
作者
Ertem, Mehmet [1 ]
Ozcelik, Feristah [1 ]
Sarac, Tugba [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Ind Engn, Eskisehir, Turkey
关键词
single machine scheduling problem; stochastic sequence-dependent setup times; Genetic Algorithm; stochastic programming; value of the stochastic solution; TARDY JOBS; GENETIC ALGORITHM; PROCESSING TIMES; TOTAL TARDINESS; EXPECTED NUMBER; BOUNDED SETUP; SUPPLY CHAIN; FLOWSHOP; MINIMIZE; OPTIMIZATION;
D O I
10.1080/00207543.2019.1581383
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider stochastic single machine scheduling problem. We assume that setup times are both sequence dependent and uncertain while processing times and due dates are deterministic. In the literature, most of the studies consider the uncertainty on processing times or due dates. However, in the real-world applications (i.e. plastic moulding industry, appliance assembly, etc.), it is common to see varying setup times due to labour or setup tools availability. In order to cover this fact in machine scheduling, we set our objective as to minimise the total expected tardiness under uncertain sequence-dependent setup times. For the solution of this NP-hard problem, several heuristics and some dynamic programming algorithms have been developed. However, none of these approaches provide an exact solution for the problem. In this study, a two-stage stochastic-programming method is utilised for the optimal solution of the problem. In addition, a Genetic Algorithm approach is proposed to solve the large-size problems approximately. Finally, the results of the stochastic approach are compared with the deterministic one to demonstrate the value of the stochastic solution.
引用
收藏
页码:3273 / 3289
页数:17
相关论文
共 59 条
[41]  
Mendes A. S., 2002, Neural Network World, V12, P165
[42]   A hybrid genetic algorithm for the single machine scheduling problem [J].
Miller, DM ;
Chen, HC ;
Matson, J ;
Liu, Q .
JOURNAL OF HEURISTICS, 1999, 5 (04) :437-454
[43]  
ozcelik F., 2011, ENDUSTRI MUHENDISLII, V22, P48
[44]   Single-machine scheduling with random machine breakdowns and randomly compressible processing times [J].
Qi, XD ;
Yin, G ;
Birge, JR .
STOCHASTIC ANALYSIS AND APPLICATIONS, 2000, 18 (04) :635-653
[45]   A two-stage chance-constrained stochastic programming model for a bio-fuel supply chain network [J].
Quddus, Md Abdul ;
Chowdhury, Sudipta ;
Marufuzzaman, Mohammad ;
Yu, Fei ;
Bian, Linkan .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 195 :27-44
[46]   A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time [J].
Rabadi, G ;
Mollaghasemi, M ;
Anagnostopoulos, GC .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (10) :1727-1751
[47]   Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times [J].
Rajendran, C ;
Ziegler, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (03) :513-522
[48]   Minimizing total tardiness in a stochastic single machine scheduling problem using approximate dynamic programming [J].
Ronconi, Debora P. ;
Powell, Warren B. .
JOURNAL OF SCHEDULING, 2010, 13 (06) :597-607
[49]   Bi-objective single machine scheduling problem with stochastic processing times [J].
Salmasnia, Ali ;
Khatami, Mostafa ;
Kazemzadeh, Reza Baradaran ;
Zegordi, Seyed Hessameddin .
TOP, 2015, 23 (01) :275-297
[50]   Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models [J].
Seo, DK ;
Klein, CA ;
Jang, W .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) :153-161