摘要
In this study, we consider stochastic single machine scheduling problem. We assume that setup times are both sequence dependent and uncertain while processing times and due dates are deterministic. In the literature, most of the studies consider the uncertainty on processing times or due dates. However, in the real-world applications (i.e. plastic moulding industry, appliance assembly, etc.), it is common to see varying setup times due to labour or setup tools availability. In order to cover this fact in machine scheduling, we set our objective as to minimise the total expected tardiness under uncertain sequence-dependent setup times. For the solution of this NP-hard problem, several heuristics and some dynamic programming algorithms have been developed. However, none of these approaches provide an exact solution for the problem. In this study, a two-stage stochastic-programming method is utilised for the optimal solution of the problem. In addition, a Genetic Algorithm approach is proposed to solve the large-size problems approximately. Finally, the results of the stochastic approach are compared with the deterministic one to demonstrate the value of the stochastic solution.
引用
收藏
页码:3273 / 3289
页数:17
相关论文
共 59 条
[31]   Algorithms for single machine total tardiness scheduling with sequence dependent setups [J].
Gupta, Skylab R. ;
Smith, Jeffrey S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) :722-739
[32]   Optimal stochastic single-machine-tardiness scheduling by stochastic branch-and-bound [J].
Gutjahr, WJ ;
Hellmayr, A ;
Pflug, GC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 117 (02) :396-413
[33]   A set of efficient heuristics and metaheuristics to solve a two-stage stochastic bi-level decision-making model for the distribution network problem [J].
Hajiaghaei-Keshteli, Mostafa ;
Fathollahi-Fard, Amir Mohammad .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 123 :378-395
[34]   Application of genetic algorithm to stochastic single machine scheduling problem with earliness and tardiness costs [J].
Hussain, SA ;
Sastry, VUK .
INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 1999, 70 (03) :383-391
[35]   Minimizing the expected number of tardy jobs when processing times are normally distributed [J].
Jang, WS ;
Klein, CM .
OPERATIONS RESEARCH LETTERS, 2002, 30 (02) :100-106
[36]   Reformulation and sampling to solve a stochastic network interdiction problem [J].
Janjarassuk, Udom ;
Linderoth, Jeff .
NETWORKS, 2008, 52 (03) :120-132
[37]   Stochastic single machine scheduling with an exponentially distributed due date [J].
Jia, CF .
OPERATIONS RESEARCH LETTERS, 2001, 28 (05) :199-203
[38]   An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups [J].
Kolahan, F ;
Liang, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :142-159
[39]   Job scheduling with dual criteria and sequence-dependent setups: mathematical versus genetic programming [J].
Lee, SM ;
Asllani, AA .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2004, 32 (02) :145-153
[40]   Robust scheduling on a single machine to minimize total flow time [J].
Lu, Chung-Cheng ;
Lin, Shih-Wei ;
Ying, Kuo-Ching .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) :1682-1691