Single machine scheduling problem with stochastic sequence-dependent setup times

被引:20
作者
Ertem, Mehmet [1 ]
Ozcelik, Feristah [1 ]
Sarac, Tugba [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Ind Engn, Eskisehir, Turkey
关键词
single machine scheduling problem; stochastic sequence-dependent setup times; Genetic Algorithm; stochastic programming; value of the stochastic solution; TARDY JOBS; GENETIC ALGORITHM; PROCESSING TIMES; TOTAL TARDINESS; EXPECTED NUMBER; BOUNDED SETUP; SUPPLY CHAIN; FLOWSHOP; MINIMIZE; OPTIMIZATION;
D O I
10.1080/00207543.2019.1581383
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider stochastic single machine scheduling problem. We assume that setup times are both sequence dependent and uncertain while processing times and due dates are deterministic. In the literature, most of the studies consider the uncertainty on processing times or due dates. However, in the real-world applications (i.e. plastic moulding industry, appliance assembly, etc.), it is common to see varying setup times due to labour or setup tools availability. In order to cover this fact in machine scheduling, we set our objective as to minimise the total expected tardiness under uncertain sequence-dependent setup times. For the solution of this NP-hard problem, several heuristics and some dynamic programming algorithms have been developed. However, none of these approaches provide an exact solution for the problem. In this study, a two-stage stochastic-programming method is utilised for the optimal solution of the problem. In addition, a Genetic Algorithm approach is proposed to solve the large-size problems approximately. Finally, the results of the stochastic approach are compared with the deterministic one to demonstrate the value of the stochastic solution.
引用
收藏
页码:3273 / 3289
页数:17
相关论文
共 59 条
[1]  
Allahverdi A., 2009, J OPERATIONS LOGISTI, P1
[2]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[3]   THREE-MACHINE FLOWSHOP SCHEDULING PROBLEM TO MINIMIZE MAKESPAN WITH BOUNDED SETUP AND PROCESSING TIMES [J].
Allahverdi, Ali .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2008, 25 (01) :52-61
[4]   An efficient network-based formulation for sequence dependent setup scheduling on parallel identical machines [J].
Anderson, Bradley E. ;
Blocher, James D. ;
Bretthauer, Kurt M. ;
Venkataramanan, Munirpallam A. .
MATHEMATICAL AND COMPUTER MODELLING, 2013, 57 (3-4) :483-493
[5]   A genetic algorithm for scheduling on a single machine with set-up times and due dates [J].
Armentano, VA ;
Mazzini, R .
PRODUCTION PLANNING & CONTROL, 2000, 11 (07) :713-720
[6]   Scheduling with shutdowns and sequence dependent set-up times [J].
Asano, M ;
Ohta, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (07) :1661-1676
[7]   Minimizing value-at-risk in single-machine scheduling [J].
Atakan, Semih ;
Bulbul, Kerem ;
Noyan, Nilay .
ANNALS OF OPERATIONS RESEARCH, 2017, 248 (1-2) :25-73
[8]   Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan [J].
Aydilek, Asiye ;
Aydilek, Harun ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) :2803-2819
[9]   Increasing the profitability and competitiveness in a production environment with random and bounded setup times [J].
Aydilek, Asiye ;
Aydilek, Harun ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (01) :106-117
[10]   A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times [J].
Aydilek, Harun ;
Allahverdi, Ali .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (12-13) :7164-7173