Risk Propagation Model and Simulation of Schedule Change in Construction Projects: A Complex Network Approach

被引:15
作者
Cheng, Yusi [1 ]
Yuan, Jingfeng [1 ]
Zhu, Lei [1 ]
Li, Wei [1 ]
机构
[1] Southeast Univ, Sch Civil Engn, Nanjing 210096, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
CHANGE MANAGEMENT; CYCLE;
D O I
10.1155/2020/8854609
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Construction schedules play an important role in construction project management. However, during construction activities, risks may arise due to unexpected schedule changes, resulting in the ineffective delivery of projects. This study aims to reveal the law of schedule change risk propagation and to analyze the effects on the risk propagation through numerical simulations. First, construction projects are represented by activity-on-node (AON) networks. A model of risk propagation is then built based on a susceptible-infected (SI) model considering the effects of the nodal characteristics on the propagation process. Next, the model is tested on a real-world project to examine cascading failures with varying parameters. The experimental results demonstrate that the model is effective in identifying the activities most capable of affecting a project schedule and evaluating the impact of schedule change risk propagation. This study will provide a basis for enhancing the robustness of AON networks and controlling the propagation of schedule change risks.
引用
收藏
页数:12
相关论文
共 44 条
[1]  
[Anonymous], 2016, Network Science
[2]  
[Anonymous], 2013, GUIDE PROJECT MANAGE, V5
[4]   Performance comparison of activity sensitivity metrics in schedule risk analysis [J].
Ballesteros-Perez, Pablo ;
Cerezo-Narvaez, Alberto ;
Otero-Mateo, Manuel ;
Pastor-Fernandez, Andres ;
Vanhoucke, Mario .
AUTOMATION IN CONSTRUCTION, 2019, 106
[5]  
Canright Geoffrey S., 2006, ComPlexUs, V3, P131, DOI 10.1159/000094195
[6]   Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory [J].
Chen, Long ;
Lu, Qiuchen ;
Zhao, Xiaojing .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
[7]   Risk Propagation Model and Its Simulation of Emergency Logistics Network Based on Material Reliability [J].
Chen, Tinggui ;
Wu, Shiwen ;
Yang, Jianjun ;
Cong, Guodong .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (23)
[8]   Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project's Attributes [J].
Cho, Kyuman ;
Kim, Taehoon ;
Hong, Taehoon .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)
[9]  
Construction Industry Institute (CII), 1986, USITC PUBL, V6-1
[10]   Factors Influencing Construction Labor Productivity in Egypt [J].
El-Gohary, Khaled Mahmoud ;
Aziz, Remon Fayek .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (01) :1-9