Fast production for order fulfillment: Implementing mass customization in electronics industry

被引:47
作者
Partanen, J
Haapasalo, H
机构
[1] Univ Oulu, Dept Ind Engn & Management, FIN-90014 Oulu, Finland
[2] JOT Automat Ltd, Elektrobit Grp Plc, FIN-90461 Oulunsalo, Finland
关键词
fast production; mass customization; modularity; customer focus;
D O I
10.1016/S0925-5273(03)00214-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Modern means to improve efficiency in manufacturing are quite diverse. However the traditional cornerstones are those still to pursue. Scale, cost, quality and time in a row are the targets and also paradigms where business is managed. Mass customization is one of these modern means to achieve these goals. It is customizing product to individual customers and producing those with principles of mass production. The key issue in it is customer focus. Fast production means delivering products to customer faster than the lead-time of the whole manufacturing process in order to satisfy customers. This can be achieved utilizing standardized methods and modularized product structure. This paper addresses to review elements of mass customization for fast productions systems. Based on theoretical cornerstones a model is created. It is generated from Finish electronic industry based on large development project entity with several manufacturing companies. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:213 / 222
页数:10
相关论文
共 20 条
[1]  
Anderson D.M., 1997, AGILE PRODUCT DEV MA
[2]  
ANTTONEN H, 2001, ELEKTRONIIKKAYRITYKS
[3]  
Bovet D., 2000, Value nets: Breaking the supply chain to unlock hidden profits
[4]   POSTPONEMENT, SPECULATION AND THE STRUCTURE OF DISTRIBUTION CHANNELS [J].
BUCKLIN, LP .
JOURNAL OF MARKETING RESEARCH, 1965, 2 (01) :26-31
[5]   A two-stage model for the design of supply chain networks [J].
Cakravastia, A ;
Toha, IS ;
Nakamura, N .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 80 (03) :231-248
[6]  
Christopher M., 1998, LOGISTICS SUPPLY CHA, V2nd
[7]   Optimization approximations for capacity constrained material requirements planning [J].
Clark, AR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 84 (02) :115-131
[8]  
Davis S. M., 1987, Future perfect
[9]  
DURAY R, 1996, P 27 ANN M DEC SCI 3, P1307
[10]  
Feitzinger E, 1997, HARVARD BUS REV, V75, P116