Algorithms for in-situ production layout of composite precast concrete members

被引:35
作者
Hong, Won-Kee [1 ]
Lee, Goonjae [1 ]
Lee, Sungho [1 ]
Kim, Sunkuk [1 ]
机构
[1] Kyung Hee Univ, Dept Architectural Engn, Yongin, South Korea
关键词
Composite precast concrete; In-situ production layout; Mathematical model; Algorithm; Point-in-polygon;
D O I
10.1016/j.autcon.2014.02.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In general, precast concrete (PC) construction is preferred to reduce construction time, improve the quality of buildings and reduce costs. This type of construction consists of in-plant or in-house production, transportation and on-site erection processes. However, the PC construction method based on in-plant production is less effective in terms of cost compared to an in-situ construction method. According to previous studies in Korea, in-plant production cost of PC members accounts for 75-77% of total cost of PC framework, transportation cost is 7-10% and erection cost is 15-17%. If qualitative in-situ production is possible, more than 10% of in-plant production cost and 7-10% of the transportation cost can be reduced, resulting in better cost competitiveness. Yet, in-situ production of PC members has complicated issues such as securing site traffic and resolving interference with other work. This study is intended to develop algorithms that can quickly establish a production layout plan by considering in-situ production factors affecting composite precast concrete members. Usefulness of the developed algorithms has been demonstrated through a case study. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:50 / 59
页数:10
相关论文
共 28 条
[11]  
Kang Su-Min, 2010, [Jorunal of the Earthquake Engineering Society of Korea, 한국지진공학회논문집], V14, P15
[12]  
Kim D.H., 2008, EFFICIENT PRODUCTION
[13]  
김범기, 2005, [Journal of the Korea Institute of Building Construction, 한국건축시공학회지], V5, P89
[14]  
Lee, 1992, P 1992 AUT ANN C ARC, V12, P629
[15]  
Lee G.J., 2011, PROCEEDING 2011 AUTU, V11, P29
[16]  
임채연, 2011, [Journal of the Korea Institute of Building Construction, 한국건축시공학회지], V11, P501
[17]   An Analysis of the CO2 Reduction Effect of a Column-Beam Structure Using Composite Precast Concrete Members [J].
Lee, Sungho ;
Joo, Jinkyu ;
Kim, Jeong Tai ;
Kim, Sunkuk .
INDOOR AND BUILT ENVIRONMENT, 2012, 21 (01) :150-162
[18]   Genetic search for solving construction site-level unequal-area facility layout problems [J].
Li, H ;
Love, PED .
AUTOMATION IN CONSTRUCTION, 2000, 9 (02) :217-226
[19]   Application of 4D for dynamic site layout and management of construction projects [J].
Ma, ZY ;
Shen, QP ;
Zhang, JP .
AUTOMATION IN CONSTRUCTION, 2005, 14 (03) :369-381
[20]  
Nielsen B., 2003, FAST NEIGHBORHOOD SE