Algorithms for in-situ production layout of composite precast concrete members

被引:35
作者
Hong, Won-Kee [1 ]
Lee, Goonjae [1 ]
Lee, Sungho [1 ]
Kim, Sunkuk [1 ]
机构
[1] Kyung Hee Univ, Dept Architectural Engn, Yongin, South Korea
关键词
Composite precast concrete; In-situ production layout; Mathematical model; Algorithm; Point-in-polygon;
D O I
10.1016/j.autcon.2014.02.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In general, precast concrete (PC) construction is preferred to reduce construction time, improve the quality of buildings and reduce costs. This type of construction consists of in-plant or in-house production, transportation and on-site erection processes. However, the PC construction method based on in-plant production is less effective in terms of cost compared to an in-situ construction method. According to previous studies in Korea, in-plant production cost of PC members accounts for 75-77% of total cost of PC framework, transportation cost is 7-10% and erection cost is 15-17%. If qualitative in-situ production is possible, more than 10% of in-plant production cost and 7-10% of the transportation cost can be reduced, resulting in better cost competitiveness. Yet, in-situ production of PC members has complicated issues such as securing site traffic and resolving interference with other work. This study is intended to develop algorithms that can quickly establish a production layout plan by considering in-situ production factors affecting composite precast concrete members. Usefulness of the developed algorithms has been demonstrated through a case study. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:50 / 59
页数:10
相关论文
共 28 条
[1]   Repertory grid technique in the development of Tacit-based Decision Support System (TDSS) for sustainable site layout planning [J].
Abdul-Rahman, Hamzah ;
Wang, Chen ;
Eng, Khe Siong .
AUTOMATION IN CONSTRUCTION, 2011, 20 (07) :818-829
[2]  
Alciatore D., 1995, TECHNICAL REPORT
[3]  
An SungHoon, 2004, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V20, P135
[4]  
[Anonymous], 2002, Journal of Architectural Engineering, DOI [10.1061/(ASCE)1076-0431(2002)8:1(19), DOI 10.1061/(ASCE)1076-0431(2002)8:1(19)]
[5]   Site pre-cast yard layout arrangement through genetic algorithms [J].
Cheung, SO ;
Tong, TKL ;
Tam, CM .
AUTOMATION IN CONSTRUCTION, 2002, 11 (01) :35-46
[6]   Relative productivity in the AEC industries in the United States for on-site and off-site activities [J].
Eastman, Charles M. ;
Sacks, Rafael .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (07) :517-526
[7]  
Hong W.K., 2010, J KOREA I ECOL ARCHI, V10, P25
[8]  
Hopper E., 2000, Two-dimensional Packing Utilising Evolutionary Algorithms and other Meta-Heuristic Methods
[9]   On the complexity of point-in-polygon algorithms [J].
Huang, CW ;
Shih, TY .
COMPUTERS & GEOSCIENCES, 1997, 23 (01) :109-118
[10]   Optimization of floor-level construction material layout using Genetic Algorithms [J].
Jang, Hyounseung ;
Lee, Sangyoub ;
Choi, Seokin .
AUTOMATION IN CONSTRUCTION, 2007, 16 (04) :531-545