ASSESSMENT OF PROJECT SUCCESS RELATED TO THE TRIPLE CONSTRAINTS APPROACH IN MANAGERIAL DECISION-MAKING PROCESSES

被引:0
作者
Louters, Exley [1 ]
Edoun, E. Innocents [1 ]
机构
[1] Univ Johannesburg, Johannesburg, South Africa
来源
GLOBAL AND NATIONAL BUSINESS THEORIES AND PRACTICE: BRIDGING THE PAST WITH THE FUTURE | 2017年
关键词
triple constraints; project; project managers; management success; managerial decision making;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Theoretically, no proof exist that the triple constraints is an acceptable measure for project success but it goes without saying that it is wildly used for exactly that purpose. The aim of this research is to determine what project success means and how and where project success should be measured. This aims stems from the obvious observations that there is a lack of understanding what constitute project success and project management success. The research therefore seeks to establish a model that will assist project managers in determining and measuring project success for managerial decision making.
引用
收藏
页码:873 / 890
页数:18
相关论文
共 36 条
  • [1] Al-Tmeemy S. M. H. M., 2010, INT J PROJECT MANAGE
  • [2] Alarcon L.F., 1998, 9 C INT GROUP LEAN C
  • [3] [Anonymous], 2013, GUIDE PROJECT MANAGE
  • [4] [Anonymous], 2010, PROJECT MANAGEMENT B
  • [5] [Anonymous], 2008, GUIDE PROJECT MANAGE
  • [6] [Anonymous], 2017, Nursing research: Generating and assessing evidence for nursing practice, DOI DOI 10.1016/0030-5073(76)90030-1
  • [7] Atkinson R., 1999, Int. J. Proj. Manag., V17, P337, DOI [DOI 10.1016/S0263-7863(98)00069-6, 10.1016/S0263-7863(98)00069-6]
  • [8] Baccarini D., 1999, PROJECT MANAGEMENT J
  • [9] Baker B.N., 1988, FACTORS AFFECTING PR, V2nd
  • [10] Blindenbach-Driessen F., 2006, THESIS