The impact of risk management on business performance: case of Algerian construction organizations

被引:0
作者
Baba Ahmed, Abla Narimene [1 ]
Megnounif, Abdellatif [1 ]
机构
[1] Univ Tlemcen, Dept Civil Engn, RISAM Lab, Tilimsen, Algeria
关键词
Algerian companies; APTE; Construction; Performance; Risk management; Systemic approach; FINANCIAL PERFORMANCE; INDUSTRY;
D O I
10.1007/s41062-020-00354-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this study is to present a new model, based on a systemic approach, to analyze the different relationships that may exist between the risk, its management and the performance of the construction companies. Moreover, the process approach used is based first on the classification of different risks in building sector, which are then transferred to the process defined by four main activities of risk management system (RMS), namely identification, analysis, assessment and treatment of risks. In addition, external and internal functional analyses of the RMS using the application of business techniques called APTE method were conducted to describe the process that will link the types of risks to the performance of building companies. The latter is measured according to four perspectives: financial, customers, internal business process, and learning and growth. Hypotheses put in place will be tested, empirically, using a questionnaire to be distributed to customers of our system, the CEO and employees of the construction companies. Finally, the proposed model will provide a new vision on the implementation of RM in Algerian construction companies to manage risks, not only to seize the profit but also to remain competitive and survive in an increasingly dynamic world.
引用
收藏
页数:16
相关论文
共 76 条
  • [41] Mazouni M, 2008, THESE MEILLEURE APPR
  • [42] Megnounif A, 2010, LAPPROCHE SYSTEMIQUE, P10
  • [43] Mehdizadeh R, 2012, THESIS, P1
  • [44] The Impact of Total Risk Management on Company's Performance
    Mohammed, Hamdu Kedir
    Knapkova, Adriana
    [J]. 19TH INTERNATIONAL CONFERENCE ENTERPRISE AND COMPETITIVE ENVIRONMENT 2016, 2016, 220 : 271 - 277
  • [45] Performance measurement system design - A literature review and research agenda
    Neely, A
    Gregory, M
    Platts, K
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2005, 25 (12) : 1228 - 1263
  • [46] A fuzzy approach to construction project risk assessment
    Nieto-Morote, A.
    Ruz-Vila, F.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 220 - 231
  • [47] Nnadi E.O. E., 2018, International Journal of Construction Engineering and Management, V7, P47, DOI [DOI 10.5923/J.IJCEM.20180701.05, 10.5923/j.ijcem.20180701, DOI 10.5923/J.IJCEM.20180701]
  • [48] Performance measurement in the construction industry: An action case investigating manufacturing methodologies
    Nudurupati, Sai
    Arshad, Tanweer
    Tumer, Trevor
    [J]. COMPUTERS IN INDUSTRY, 2007, 58 (07) : 667 - 676
  • [49] The Characteristics of Firms That Hire Chief Risk Officers
    Pagach, Donald
    Warr, Richard
    [J]. JOURNAL OF RISK AND INSURANCE, 2011, 78 (01) : 185 - 211
  • [50] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
    PERRY, JG
    HAYES, RW
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (JUN): : 499 - 521