The impact of risk management on business performance: case of Algerian construction organizations

被引:0
作者
Baba Ahmed, Abla Narimene [1 ]
Megnounif, Abdellatif [1 ]
机构
[1] Univ Tlemcen, Dept Civil Engn, RISAM Lab, Tilimsen, Algeria
关键词
Algerian companies; APTE; Construction; Performance; Risk management; Systemic approach; FINANCIAL PERFORMANCE; INDUSTRY;
D O I
10.1007/s41062-020-00354-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this study is to present a new model, based on a systemic approach, to analyze the different relationships that may exist between the risk, its management and the performance of the construction companies. Moreover, the process approach used is based first on the classification of different risks in building sector, which are then transferred to the process defined by four main activities of risk management system (RMS), namely identification, analysis, assessment and treatment of risks. In addition, external and internal functional analyses of the RMS using the application of business techniques called APTE method were conducted to describe the process that will link the types of risks to the performance of building companies. The latter is measured according to four perspectives: financial, customers, internal business process, and learning and growth. Hypotheses put in place will be tested, empirically, using a questionnaire to be distributed to customers of our system, the CEO and employees of the construction companies. Finally, the proposed model will provide a new vision on the implementation of RM in Algerian construction companies to manage risks, not only to seize the profit but also to remain competitive and survive in an increasingly dynamic world.
引用
收藏
页数:16
相关论文
共 76 条
  • [1] Abdou O.A., 1996, J ARCHITECTURAL ENG, V2, P3, DOI 10.1061/(ASCE)1076-0431(1996)2:1(3)
  • [2] A review of techniques for risk management in projects
    Ahmed, Ammar
    Kayis, Berman
    Amornsawadwatana, Sataporn
    [J]. BENCHMARKING-AN INTERNATIONAL JOURNAL, 2007, 14 (01) : 22 - 36
  • [3] Ahmed Zaid M, 2011, CONTRIBUTION PERFORM, P1
  • [4] Akintoye A.S., 1997, INT J PROJ MANAG, V15, P31, DOI DOI 10.1016/S0263-7863(96)00035-X
  • [5] Amit E, 2014, INT J MANAG, V5, P976
  • [6] [Anonymous], 2009, 73 ISO CEI
  • [7] [Anonymous], 2010, 31000 NF ISO, P33
  • [8] Antonio B, 2013, EVENTS MANAG, DOI [10.1007/978-88-470-2531-8, DOI 10.1007/978-88-470-2531-8]
  • [9] A New Model for the Impact of Knowledge Management on University Performance.
    Asma, Kherbouche
    Abdellatif, Megnounif
    [J]. JOURNAL OF INFORMATION & KNOWLEDGE MANAGEMENT, 2016, 15 (04)
  • [10] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357