Forecast-informed hydropower optimization at long and short-time scales for a multiple dam network

被引:19
作者
Ahmad, Shahryar Khalique [1 ]
Hossain, Faisal [1 ]
机构
[1] Univ Washington, Dept Civil & Environm Engn, More Hall 201, Seattle, WA 98195 USA
基金
欧盟地平线“2020”;
关键词
TERM RESERVOIR OPERATION; STREAMFLOW FORECASTS; ECONOMIC VALUE; MODEL; WATER; SYSTEM; IMPACT; RULES;
D O I
10.1063/1.5124097
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This study presents a scheme for co-optimizing the long-term (seasonal) reservoir operating objectives with the short-term (daily) objectives for multi-dam networks to maximize hydropower generation. Long-term optimal reservoir storage provides temporal space to optimize operation of the dams at short-term based on forecasted reservoir inflow. This study asks if there is an added benefit of co-optimization of operations at long- and short-term scales for hydropower generation. The multi-objective optimization problem at both the temporal scales was simultaneously solved considering Pareto optimality between conflicting objectives. Constraints pertaining to flood control, dam safety, and environmental flow were imposed. The proposed scheme was implemented over a network of Blue Mesa, Morrow Point, and Crystal dams in the Upper Colorado Basin. Ensemble forecast forcings from publicly available numerical weather prediction and climate models were used as inputs for the daily and monthly scale inflow forecasts. The results show improvements of 41%, 27%, and 15% in hydropower generation using the co-optimization during wet, moderate, and dry years, respectively, against a benchmark that neglects inflow forecasts. This study demonstrates added benefit of co-optimizing the operations for hydropower generation based on short- and long-term forecasted reservoir inflow. Given that most dams today operate as a network in a river basin, we recommend moving away from single dam and single time scale optimization to a multiple-dam with long- and short-term scale co-optimization-based operations to make renewable energy generation more efficient.
引用
收藏
页数:19
相关论文
共 51 条
[11]   An aggregate stochastic dynamic programming model of multireservoir systems [J].
Archibald, TW ;
McKinnon, KIM ;
Thomas, LC .
WATER RESOURCES RESEARCH, 1997, 33 (02) :333-340
[12]   OPTIMIZATION OF REAL-TIME OPERATION OF A MULTIPLE-RESERVOIR SYSTEM [J].
BECKER, L ;
YEH, WWG .
WATER RESOURCES RESEARCH, 1974, 10 (06) :1107-1112
[13]  
Becker L., 1976, J. Water Resour. Plann. Manage. Div, V102, P101, DOI DOI 10.1061/JWRDDC.0000001
[14]   Tailoring seasonal climate forecasts for hydropower operations [J].
Block, P. .
HYDROLOGY AND EARTH SYSTEM SCIENCES, 2011, 15 (04) :1355-1368
[15]   Integrating long- and short-term reservoir operation models via stochastic and deterministic optimization: Case study in Japan [J].
Celeste, Alcigeimes Batista ;
Suzuki, Koichi ;
Kadota, Akihiro .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2008, 134 (05) :440-448
[16]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[17]   GFDL's CM2 global coupled climate models. Part I: Formulation and simulation characteristics [J].
Delworth, TL ;
Broccoli, AJ ;
Rosati, A ;
Stouffer, RJ ;
Balaji, V ;
Beesley, JA ;
Cooke, WF ;
Dixon, KW ;
Dunne, J ;
Dunne, KA ;
Durachta, JW ;
Findell, KL ;
Ginoux, P ;
Gnanadesikan, A ;
Gordon, CT ;
Griffies, SM ;
Gudgel, R ;
Harrison, MJ ;
Held, IM ;
Hemler, RS ;
Horowitz, LW ;
Klein, SA ;
Knutson, TR ;
Kushner, PJ ;
Langenhorst, AR ;
Lee, HC ;
Lin, SJ ;
Lu, J ;
Malyshev, SL ;
Milly, PCD ;
Ramaswamy, V ;
Russell, J ;
Schwarzkopf, MD ;
Shevliakova, E ;
Sirutis, JJ ;
Spelman, MJ ;
Stern, WF ;
Winton, M ;
Wittenberg, AT ;
Wyman, B ;
Zeng, F ;
Zhang, R .
JOURNAL OF CLIMATE, 2006, 19 (05) :643-674
[18]  
Dong X., 2006, Hydrology and Earth System Sciences Discussions, V3, P3771, DOI DOI 10.5194/hessd-3-3771-2006
[19]   Performance of Deterministic and Probabilistic Hydrological Forecasts for the Short-Term Optimization of a Tropical Hydropower Reservoir [J].
Fan, Fernando Mainardi ;
Schwanenberg, Dirk ;
Alvarado, Rodolfo ;
dos Reis, Alberto Assis ;
Collischonn, Walter ;
Naumman, Steffi .
WATER RESOURCES MANAGEMENT, 2016, 30 (10) :3609-3625
[20]   Simulation-optimization model of reservoir operation based on target storage curves [J].
Fang, Hong-bin ;
Hu, Tie-song ;
Zeng, Xiang ;
Wu, Feng-yan .
WATER SCIENCE AND ENGINEERING, 2014, 7 (04) :433-445